Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
402hours of spills in 2025 between them (typical neighbourhood: about 36)
83spill events counted
Southern Water
Tenterden Wwtwinto Trib Of Newmill Channel27 spills, 217 hours in 2025
1.4 km away
Southern Water
Tenterden Wwtwinto Trib Of Newmill Channel37 spills, 117 hours in 2025
1.4 km away
Southern Water
Hales Place Orchard Csointo The Tider Gill19 spills, 67 hours in 2025
2 planned, approved or being built and 1 running (7 MW between them). Those within 5 km are on the map above.
Solar farm
Appledore Road, Kenardington - Solar FarmPlanning application in · 35 MW
Jul 2025 7.9 km away
Rooftop solar
Ebrofrost, Hobbs Lane - Solar PanelsApproved, not yet built
May 2025 8.8 km away
Running nearest: Kenardington Place Farm (solar farm, 9.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
South Kent Energy ParkGenerating Stations · The site is in the administrative areas of Kent County Council and Folkstone and Hythe District Council, on farmland on Romney Marsh around the village of Old Romney. Approximately half the site is to the north of the A259 and the remaining half to the south of it.
application due August 2027 17.4 km away
Pre-application
Shepway Energy ParkGenerating Stations · Located on land north of Newchurch and 6km south of Ashford in Kent.
Stonestreet Green SolarGenerating Stations · Land at Aldington, southeast of Ashford in Kent
decided Oct 2025 18.3 km away
Pre-application
South Brooks Solar FarmGenerating Stations · Near the Dungeness power station in Kent, to the south of the village of Old Romney and to the east of New Romney.
application due March 2027 19.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Tenterden & Rolvenden: +21% over five years (2020 → 2025).
Council tax list: 70 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.2% in two years.