Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
173hours of spills in 2025 between them (typical neighbourhood: about 36)
21spill events counted
Southern Water
Brown Mill Little Chart Forstal Ceointo The Great Stour21 spills, 173 hours in 2025
Consort Frozen Foods Limited, Wotton Road - Solar PanelsApproved, not yet built · 180 kW
Jun 2023 8.2 km away
Rooftop solar
Wyvern Way, Henwood Industrial Estate - Solar PanelsApproved, not yet built
Feb 2023 8.3 km away
Running nearest: Former Pluckley Landfill Site (landfill gas, 1.7 km); Oaklands Farm (solar farm, 2.4 km); East Lenham Solar Farm (solar farm, 7.0 km); Station Road - Solar Array (rooftop solar, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The site is in the administrative areas of Kent County Council and Folkstone and Hythe District Council, on farmland on Romney Marsh around the village of Old Romney. Approximately half the site is to the north of the A259 and the remaining half to the south of it.
application due August 2027 22.9 km away
Pre-application
South Brooks Solar FarmGenerating Stations · Near the Dungeness power station in Kent, to the south of the village of Old Romney and to the east of New Romney.
application due March 2027 25.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.