Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Mansfield Farms, Nickle Lane - Solar ArrayApproved, not yet built · 370 kW
Sept 2022 9.2 km away
Rooftop solar
Nickle Farm, Nickle Lane - Solar PanelsApproved, not yet built · 310 kW
Oct 2024 9.2 km away
Running nearest: Oaklands Farm (solar farm, 7.7 km); Station Road - Solar Array (rooftop solar, 7.7 km); William Harvey Hospital (solar farm, 8.7 km); Nickle Farm (rooftop solar, 9.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The site is in the administrative areas of Kent County Council and Folkstone and Hythe District Council, on farmland on Romney Marsh around the village of Old Romney. Approximately half the site is to the north of the A259 and the remaining half to the south of it.
South Brooks Solar FarmGenerating Stations · Near the Dungeness power station in Kent, to the south of the village of Old Romney and to the east of New Romney.
application due March 2027 28.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.