Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London
decided Apr 2020 26.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Borough Green, Wrotham & Shipbourne: +20% over five years (2020 → 2025).
Council tax list: 30 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.1% in two years.
Unit A Riverside Business Park - Roof mounted solar panelsApproved, not yet built · 990 kW
Jul 2022 9.6 km away
Battery storage
Chimmens Solar FarmApproved, not yet built
Jul 2025 9.9 km away
Running nearest: Stangate Landfill Site (landfill gas, 2.0 km); Land off Ford Lane (solar farm, 2.2 km); Offham Landfill Site Phase II (landfill gas, 2.6 km); Kingshill Solar Farm (solar farm, 4.6 km); Aylesford BESS (battery storage, 9.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.