What's changing near TF9 3DE
Within 2 km, around Market Drayton in Shropshire. Building, planning, schools, transport, prices and crime.
152new homes completed within 2 km, last 2 years
78homes given permission on brownfield sites since 2021
+3.0%like-for-like prices in Market Drayton, 2024 → 2025 (council +3.0%)
-10%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
20 new homes completed4 flats, 16 houses · Nov 2024 – Jul 2026
Jul 2026
450 m away - New homes
10 new homes completedhouses · Nov 2024 – Jun 2026
Jun 2026
950 m away - New homes
9 new homes completedhouses · Jan 2026 – Apr 2026
Apr 2026
950 m away - New homes
11 new homes completedhouses · Dec 2025 – Mar 2026
Mar 2026
650 m away - New homes
6 new homes completedhouses · Mar 2025 – Feb 2026
Feb 2026
500 m away - New homes
20 new homes completedhouses · Oct 2024 – Feb 2026
Feb 2026
850 m away - New homes
15 new homes completedhouses · Nov 2024 – Jan 2026
Jan 2026
1.0 km away - New homes
26 new homes completedhouses · Mar 2025 – Nov 2025
Nov 2025
750 m away - New homes
10 new homes completedhouses · Oct 2024 – Jul 2025
Jul 2025
1000 m away - New homes
6 new homes completedflats · May 2025
May 2025
150 m away - New homes
6 new homes completedhouses · Oct 2024 – Jan 2025
Jan 2025
900 m away - Planning permission
Permission for 72 homesVicon Works, Milton Drive, Market Drayton, Shropshire, TF9 3SP (outline planning permission)
New-home postcodes with fewer than 5 homes are counted above but not listed. 18 postcodes nearby had new homes completed in the last two years.
3homes extended 2021–2025, typically adding 29 m²
14since energy certificates began (2008)
0in TF9 3DE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
21hours of spills in 2025 between them (typical neighbourhood: about 36)
30spill events counted
- Severn Trent Water
Market Drayton Stwinto River Tern23 spills, 18 hours in 2025
1.3 km away - Severn Trent Water
Market Drayton - Walkmill Rd (Cso)into River Tern7 spills, 2 hours in 2025
850 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
7 planned, approved or being built and 0 running. Those within 5 km are on the map above.
- Rooftop solar
Merlot Chitty Farms, Betton - Solar PanelsApproved, not yet built · 300 kW
Sept 2025
3.3 km away - Battery storage
Hollins Lane - Battery Energy StorageApproved, not yet built · 13 MW
May 2023
3.3 km away - Solar farm
Cheswardine Hall Residential Home - Solar PanelsApproved, not yet built · 240 kW
Mar 2024
6.2 km away - Rooftop solar
TB Electrics, Sandford - Solar PanelsApproved, not yet built · 170 kW
Aug 2025
7.3 km away - Solar farm
Flashbrook Road, Knighton - Solar FarmPlanning application in · 50 MW
Feb 2024
9.6 km away - Battery storage
Flashbrook Road, Knighton - Solar FarmPlanning application in · 15 MW
Feb 2024
9.6 km away - Solar farm
Lower Heath Farm, Lower Heath - Solar PanelsApproved, not yet built · 560 kW
Jun 2025
9.8 km away
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
8 permitted works running now or planned, 5 of them major.
- Major, planned
Manor Gardens, Market DraytonHighway improvement works · SHROPSHIRE COUNCIL · Some carriageway incursion
Dec 2026 to Jan 2027
250 m away - Major, planned
Salisbury Road, Market DraytonHighway improvement works · SHROPSHIRE COUNCIL · Give and take
Dec 2026 to Dec 2026
800 m away - Major
Salisbury Road, Market DraytonHighway improvement works · SHROPSHIRE COUNCIL · Give and take
Oct 2026 to Oct 2026
800 m away - Major, planned
Salisbury Road, Market DraytonHighway improvement works · SHROPSHIRE COUNCIL · Road closure
Dec 2026 to Dec 2026
900 m away - Major, planned
Shrewsbury Road, Market DraytonHighway improvement works · SHROPSHIRE COUNCIL · Give and take
Dec 2026 to Dec 2026
900 m away - Standard
Longlands Lane, Market DraytonHighway improvement works · SHROPSHIRE COUNCIL · Give and take
Oct 2026 to Oct 2026
450 m away - Standard
Red Bank Road, Market DraytonHighway improvement works · SHROPSHIRE COUNCIL · No carriageway incursion
Nov 2026 to Nov 2026
850 m away - Standard
Highfields, Market DraytonHighway improvement works · SHROPSHIRE COUNCIL · No carriageway incursion
Nov 2026 to Nov 2026
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Mar 2014
20.3 km away - Decided
Meaford Energy CentreGenerating Stations · Former Meaford Power Station site, east of Meaford Road, to the north of the town of Stone decided Jul 2016
21.7 km away - Pre-application
Salinae Hydrogen Storage projectUnderground Gas Storage Facilities · The site is located approximately 5.2km south west of the town of Middlewich, west of Warmingham, in the Cheshire East Council area. It is partly on the site of the existing British Salt/Kistos Energy Storage facility. application due July 2027
26.8 km away - Decideddecided Mar 2020
27.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.