Country England and Wales › Region West Midlands › Council Telford and Wrekin › Neighbourhood Sutton Hill › Postcode TF7 4BT What's changing near TF7 4BT Within 2 km, around Sutton Hill in Telford and Wrekin. Building, planning, schools, transport, prices and crime.
4 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+10.3% like-for-like prices in Sutton Hill, 2024 → 2025 (council +1.7%)
+2% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
11 homes extended 2021–2025, typically adding 24 m²
27 since energy certificates began (2008)
0 in TF7 4BT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
3 hours of spills in 2025 between them (typical neighbourhood: about 36)
15 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 27 planned, approved or being built and 6 running (23 MW between them). Those within 5 km are on the map above.
Rooftop solar Wz Packaging, Halesfield - Solar Panels Approved, not yet built · 520 kW
Jul 2022 900 m away Energy from waste Halesfield - Energy Facility Approved, not yet built · 15 MW
Sept 2021 1.2 km away Rooftop solar Mail Solutions - Solar Panels Planning application in · 600 kW
May 2024 1.6 km away Solar farm Kemberton - Solar Farm Approved, not yet built · 22 MW
Feb 2024 2.4 km away Rooftop solar Syspal, Cockshutt Lane - Solar Panels Approved, not yet built · 160 kW
Jan 2023 3.2 km away Battery storage Stafford Park - Battery Energy Storage Approved, not yet built · 200 kW
Sept 2025 4.1 km away Rooftop solar Telford Ten Pin, International Way - Solar PV Panels Approved, not yet built · 230 kW
Oct 2023 4.3 km away Battery storage Buildwas Bank - Battery Energy Storage Approved, not yet built
Aug 2025 4.4 km away Rooftop solar Telford Shopping Centre, Northfield Street - Solar Panels Approved, not yet built · 580 kW
Mar 2026 4.5 km away Rooftop solar Telford Shopping Centre, Woodhouse Central - Solar Photovoltaic Panels Approved, not yet built · 700 kW
Sept 2023 4.6 km away Solar farm Road and street works within 1 km 8 permitted works running now or planned, 6 of them major.
Major Path From Sutton Way Near Number 3, Telford Utility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 300 m away Major Path From Hilda Hooke Close Near Number 1, Telford Utility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 300 m away Major Madeley & Sutton Hill Path Between Number 49 And 1, Telford Utility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 300 m away Major Madeley & Sutton Hill Path Between Number 6 And 5, Telford Utility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 350 m away Major Madeley & Sutton Hill Path Near Number 43, Telford Utility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 350 m away Major Path From Selbourne Near Number 43, Telford Utility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 350 m away Minor Path From Smallwood Between Number 81 And 94, Telford New service connection · BT · Give and take
Oct 2026 to Oct 2026 800 m away Minor Madeley And Sutton Hill Path Between Number 44 And 33, Telford New service connection · BT · Give and take
Oct 2026 to Oct 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2020 22.1 km away Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 24.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Candles/Coalmoor Landfill (landfill gas, 5.3 km); Ricoh UK Products (solar farm, 5.5 km); Lyreco - Telford Distribution Centre (rooftop solar, 8.0 km); Granville Landfill Site (landfill gas, 8.0 km); Granville Road Solar Farm (solar farm, 8.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.