Country England and Wales › Region West Midlands › Council Telford and Wrekin › Neighbourhood Ironbridge, Admaston & Higher Ercall › Postcode TF5 0DD What's changing near TF5 0DD Within 2 km, around Ironbridge, Admaston & Higher Ercall in Telford and Wrekin. Building, planning, schools, transport, prices and crime.
182 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.8% like-for-like prices in Ironbridge, Admaston & Higher Ercall, 2024 → 2025 (council +1.7%)
-11% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 18 new homes completed houses · Dec 2025 – Oct 2026
Oct 2026 1.8 km away New homes 23 new homes completed houses · Nov 2024 – Aug 2026
Aug 2026 1.7 km away New homes 23 new homes completed houses · May 2025 – Jul 2026
Jul 2026 1.8 km away New homes 11 new homes completed houses · Dec 2025 – May 2026
May 2026 1.6 km away New homes 26 new homes completed houses · Nov 2024 – Apr 2026
Apr 2026 1.6 km away New homes 10 new homes completed houses · Jun 2025 – Apr 2026
Apr 2026 1.7 km away New homes 19 new homes completed houses · Nov 2024 – Nov 2025
Nov 2025 1.6 km away New homes 11 new homes completed houses · Nov 2024 – May 2025
May 2025 1.4 km away New homes 17 new homes completed houses · Jan 2025 – May 2025
May 2025 1.2 km away New homes 6 new homes completed houses · Dec 2024 – Apr 2025
Apr 2025 1.6 km away New homes 5 new homes completed houses · Dec 2024 – Jan 2025
Jan 2025 1.2 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
7 homes extended 2021–2025, typically adding 32 m²
11 since energy certificates began (2008)
0 in TF5 0DD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
32 hours of spills in 2025 between them (typical neighbourhood: about 36)
13 spill events counted
Severn Trent Water Wellington - Morrisons Cso into Tributary Of River Tern 13 spills, 32 hours in 2025
1.3 km away Severn Trent Water Wellington - Gas Works Cso into Tributary Of River Tern 0 spills, 0 hours in 2025
1.3 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 33 planned, approved or being built and 8 running (34 MW between them). Those within 5 km are on the map above.
Rooftop solar Princess Royal Hospital, Grainger Drive - Solar PV Panels Approved, not yet built · 2 MW
Jun 2026 2.2 km away Solar farm Tiddiecross Lane, Charlton - Tiddiecross Solar Farm & Battery Storage Approved, not yet built · 14 MW
Jun 2025 2.5 km away Battery storage Tiddiecross Lane, Charlton - Tiddiecross Solar Farm & Battery Storage Approved, not yet built
Jun 2025 2.5 km away Rooftop solar Furrows Ford Store, Furrows Business Park - Solar Panels Approved, not yet built · 270 kW
Sept 2024 3.5 km away Rooftop solar Sugden Farm - Solar Panels Approved, not yet built · 440 kW
Aug 2023 3.5 km away Solar farm Steeraway Farm - Solar Farm Being built · 30 MW
Sept 2025 4.2 km away Solar farm New Works Lane - Solar Farm Planning application in · 30 MW
Jul 2021 4.3 km away Rooftop solar Kraft Heinz, Hortonwood - Solar Panels Approved, not yet built · 810 kW
Apr 2026 4.9 km away Rooftop solar Cherwell Enterprise Park, Hortonwood 2 -Solar Panels Planning application in · 160 kW
May 2026 5.0 km away Rooftop solar Makita Manufacturing Europe - Solar Photovoltaic Panels Approved, not yet built · 390 kW
Jul 2022 5.3 km away Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Mar 2020 27.3 km away Decided decided May 2020 28.6 km away Decided decided Mar 2014 29.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Rushmoor Lane Farm (Cheshire Coppice) (solar farm, 1.4 km); Tiddiecross Solar Farm (solar farm, 2.5 km); Wheat Leasows Solar Park (solar farm, 3.9 km); Candles/Coalmoor Landfill (landfill gas, 6.2 km); Lyreco - Telford Distribution Centre (rooftop solar, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.