Country England and Wales › Region West Midlands › Council Telford and Wrekin › Neighbourhood Hollinswood & Randlay › Postcode TF3 2JG What's changing near TF3 2JG Within 2 km, around Hollinswood & Randlay in Telford and Wrekin. Building, planning, schools, transport, prices and crime.
264 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-1.0% like-for-like prices in Hollinswood & Randlay, 2024 → 2025 (council +1.7%)
-6% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 44 new homes completed houses · Aug 2025 – Oct 2026
planned Oct 2026 1.2 km away New homes 14 new homes completed houses · Apr 2026 – Oct 2026
planned Oct 2026 1.5 km away New homes 29 new homes completed houses · May 2026 – Oct 2026
planned Oct 2026 1000 m away New homes 13 new homes completed houses · Nov 2025 – Sep 2026
Sept 2026 950 m away New homes 17 new homes completed houses · Mar 2026 – Aug 2026
Aug 2026 1.4 km away New homes 23 new homes completed 2 flats, 21 houses · Jun 2025 – Aug 2026
Aug 2026 1.3 km away New homes 19 new homes completed houses · Mar 2026 – Aug 2026
Aug 2026 1.5 km away New homes 84 new homes completed flats · Mar 2026
Mar 2026 1.6 km away New homes 17 new homes completed houses · Apr 2025 – Jan 2026
Jan 2026 1.3 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
10 homes extended 2021–2025, typically adding 19 m²
14 since energy certificates began (2008)
0 in TF3 2JG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 29 planned, approved or being built and 7 running (27 MW between them). Those within 5 km are on the map above.
Battery storage Stafford Park - Battery Energy Storage Approved, not yet built · 200 kW
Sept 2025 1.1 km away Rooftop solar Telford Ten Pin, International Way - Solar PV Panels Approved, not yet built · 230 kW
Oct 2023 1.2 km away Rooftop solar Telford Shopping Centre, Northfield Street - Solar Panels Approved, not yet built · 580 kW
Mar 2026 1.3 km away Rooftop solar Telford Shopping Centre, Woodhouse Central - Solar Photovoltaic Panels Approved, not yet built · 700 kW
Sept 2023 1.5 km away Solar farm Telford Shopping Centre - Solar Photovoltaic PV Array Approved, not yet built · 2 MW
Jan 2022 1.5 km away Battery storage Ercall House, Stafford Park - Micro Energy Storage Facility Approved, not yet built · 200 kW
Aug 2025 1.6 km away Battery storage Radford House - Energy Storage Facility Approved, not yet built · 200 kW
Sept 2025 1.8 km away Rooftop solar Parkside Court - Solar Panels & Air Source Heat Pumps Approved, not yet built · 270 kW
Aug 2022 2.0 km away Rooftop solar TCL Packaging, Stafford Park - Solar Panels Approved, not yet built · 530 kW
Apr 2025 2.0 km away Rooftop solar Mail Solutions - Solar Panels Planning application in · 600 kW
May 2024 2.5 km away Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2020 21.3 km away Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 24.2 km away Decided decided Mar 2014 28.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Ricoh UK Products (solar farm, 2.3 km); Candles/Coalmoor Landfill (landfill gas, 4.3 km); Lyreco - Telford Distribution Centre (rooftop solar, 4.7 km); Granville Landfill Site (landfill gas, 4.8 km); Granville Road Solar Farm (solar farm, 5.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.