What's changing near TF2 9DG
Within 2 km, around St George's in Telford and Wrekin. Building, planning, schools, transport, prices and crime.
489new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.7%like-for-like prices in St George's, 2024 → 2025 (council +1.7%)
-3%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
14 new homes completedhouses · Oct 2024 – Sep 2026
Sept 2026
300 m away - New homes
34 new homes completedhouses · Nov 2024 – Sep 2026
Sept 2026
1.4 km away - New homes
35 new homes completedhouses · Nov 2024 – Sep 2026
Sept 2026
1.4 km away - New homes
39 new homes completedhouses · Oct 2024 – Sep 2026
Sept 2026
400 m away - New homes
27 new homes completedhouses · Oct 2024 – Jul 2026
Jul 2026
1.4 km away - New homes
26 new homes completedhouses · Dec 2025 – Jun 2026
Jun 2026
1.5 km away - New homes
31 new homes completedhouses · Nov 2024 – May 2026
May 2026
1.4 km away - New homes
26 new homes completedhouses · Dec 2024 – Apr 2026
Apr 2026
1.4 km away - New homes
23 new homes completedhouses · Jan 2026 – Mar 2026
Mar 2026
500 m away - New homes
25 new homes completedhouses · Jun 2025 – Dec 2025
Dec 2025
1.7 km away - New homes
23 new homes completedhouses · Oct 2024 – Nov 2025
Nov 2025
1.3 km away - New homes
13 new homes completedhouses · Aug 2025 – Nov 2025
Nov 2025
250 m away
11homes extended 2021–2025, typically adding 19 m²
17since energy certificates began (2008)
1in TF2 9DG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
31 planned, approved or being built and 9 running (42 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Lyreco, Donnington Wood - Solar PanelsApproved, not yet built · 4 MW
Dec 2025
1.2 km away - Battery storage
Ercall House, Stafford Park - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Aug 2025
2.2 km away - Battery storage
Radford House - Energy Storage FacilityApproved, not yet built · 200 kW
Sept 2025
2.2 km away - Rooftop solar
Makita Manufacturing Europe - Solar Photovoltaic PanelsApproved, not yet built · 390 kW
Jul 2022
2.5 km away - Rooftop solar
Makita Manufacturing Europe - Solar PanelsApproved, not yet built · 170 kW
Jan 2025
2.5 km away - Solar farm
Telford Shopping Centre - Solar Photovoltaic PV ArrayApproved, not yet built · 2 MW
Jan 2022
2.6 km away - Rooftop solar
Telford Shopping Centre, Woodhouse Central - Solar Photovoltaic PanelsApproved, not yet built · 700 kW
Sept 2023
2.6 km away - Rooftop solar
Kraft Heinz, Hortonwood - Solar PanelsApproved, not yet built · 810 kW
Apr 2026
2.7 km away - Rooftop solar
Cherwell Enterprise Park, Hortonwood 2 -Solar PanelsPlanning application in · 160 kW
May 2026
2.7 km away - Rooftop solar
Telford Shopping Centre, Northfield Street - Solar PanelsApproved, not yet built · 580 kW
Mar 20262.7 km away
Road and street works within 1 km
6 permitted works running now or planned, 3 of them major.
- Major, planned
School Street, TelfordHighway improvement works · TELFORD & WREKIN COUNCIL · Road closure
Dec 2026 to Dec 2026
650 m away - Major
School Street, TelfordHighway improvement works · TELFORD & WREKIN COUNCIL · Road closure
Oct 2026 to Oct 2026
650 m away - Major, planned
Telford Way, TelfordHighway improvement works · TELFORD & WREKIN COUNCIL · Road closure
Nov 2026 to Dec 2026
900 m away - Standard
Gower Street, TelfordDisconnection or alteration of supply · CADENT GAS LIMITED · Two-way signals
Oct 2026 to Oct 2026
100 m away - Standard
Walker Crescent, TelfordUtility asset works · National Grid Electricity Distribution (West Midlands) · Some carriageway incursion
Oct 2026 to Oct 2026
350 m away - Standard
Grove Street, TelfordHighway improvement works · TELFORD & WREKIN COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2020
21.3 km away - Decided
M54 to M6 Link RoadHighways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022
24.8 km away - Decideddecided Mar 2014
25.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lyreco - Telford Distribution Centre (rooftop solar, 1.3 km); Granville Road Solar Farm (solar farm, 2.0 km); Granville Landfill Site (landfill gas, 2.0 km); Ricoh UK Products (solar farm, 2.2 km); Wheat Leasows Solar Park (solar farm, 4.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.