Country England and Wales › Region West Midlands › Council Telford and Wrekin › Neighbourhood St George's › Postcode TF2 9AY What's changing near TF2 9AY Within 2 km, around St George's in Telford and Wrekin. Building, planning, schools, transport, prices and crime.
593 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.7% like-for-like prices in St George's, 2024 → 2025 (council +1.7%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 20 new homes completed houses · Feb 2026 – Sep 2026
Sept 2026 2.0 km away New homes 14 new homes completed houses · Oct 2024 – Sep 2026
Sept 2026 450 m away New homes 34 new homes completed houses · Nov 2024 – Sep 2026
Sept 2026 1.4 km away New homes 35 new homes completed houses · Nov 2024 – Sep 2026
Sept 2026 1.5 km away New homes 39 new homes completed houses · Oct 2024 – Sep 2026
Sept 2026 450 m away New homes 27 new homes completed houses · Oct 2024 – Jul 2026
Jul 2026 1.4 km away New homes 26 new homes completed houses · Dec 2025 – Jun 2026
Jun 2026 1.5 km away New homes 31 new homes completed houses · Nov 2024 – May 2026
May 2026 1.4 km away New homes 26 new homes completed houses · Dec 2024 – Apr 2026
Apr 2026 1.5 km away New homes 23 new homes completed houses · Jan 2026 – Mar 2026
Mar 2026 600 m away New homes 84 new homes completed flats · Mar 2026
Mar 2026 2.0 km away New homes 25 new homes completed houses · Jun 2025 – Dec 2025
Dec 2025 1.5 km away 15 homes extended 2021–2025, typically adding 19 m²
23 since energy certificates began (2008)
1 in TF2 9AY itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 31 planned, approved or being built and 9 running (42 MW between them). Those within 5 km are on the map above.
Rooftop solar Lyreco, Donnington Wood - Solar Panels Approved, not yet built · 4 MW
Dec 2025 1.5 km away Battery storage Ercall House, Stafford Park - Micro Energy Storage Facility Approved, not yet built · 200 kW
Aug 2025 1.9 km away Battery storage Radford House - Energy Storage Facility Approved, not yet built · 200 kW
Sept 2025 1.9 km away Solar farm Telford Shopping Centre - Solar Photovoltaic PV Array Approved, not yet built · 2 MW
Jan 2022 2.3 km away Rooftop solar Telford Shopping Centre, Woodhouse Central - Solar Photovoltaic Panels Approved, not yet built · 700 kW
Sept 2023 2.3 km away Rooftop solar Telford Shopping Centre, Northfield Street - Solar Panels Approved, not yet built · 580 kW
Mar 2026 2.4 km away Rooftop solar Parkside Court - Solar Panels & Air Source Heat Pumps Approved, not yet built · 270 kW
Aug 2022 2.4 km away Rooftop solar TCL Packaging, Stafford Park - Solar Panels Approved, not yet built · 530 kW
Apr 2025 2.6 km away Rooftop solar Telford Ten Pin, International Way - Solar PV Panels Approved, not yet built · 230 kW
Oct 2023 2.6 km away Rooftop solar Makita Manufacturing Europe - Solar Photovoltaic Panels Approved, not yet built · 390 kW
Jul 2022 2.7 km away Road and street works within 1 km 6 permitted works running now or planned, 3 of them major.
Major, planned School Street, Telford Highway improvement works · TELFORD & WREKIN COUNCIL · Road closure
Dec 2026 to Dec 2026 400 m away Major School Street, Telford Highway improvement works · TELFORD & WREKIN COUNCIL · Road closure
Oct 2026 to Oct 2026 400 m away Major, planned Telford Way, Telford Highway improvement works · TELFORD & WREKIN COUNCIL · Road closure
Nov 2026 to Dec 2026 700 m away Standard Walker Crescent, Telford Utility asset works · National Grid Electricity Distribution (West Midlands) · Some carriageway incursion
Oct 2026 to Oct 2026 250 m away Standard Gower Street, Telford Disconnection or alteration of supply · CADENT GAS LIMITED · Two-way signals
Oct 2026 to Oct 2026 350 m away Standard Grove Street, Telford Highway improvement works · TELFORD & WREKIN COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 400 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2020 21.3 km away Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 24.8 km away Decided decided Mar 2014 25.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lyreco - Telford Distribution Centre (rooftop solar, 1.5 km); Ricoh UK Products (solar farm, 2.0 km); Granville Landfill Site (landfill gas, 2.2 km); Granville Road Solar Farm (solar farm, 2.2 km); Wheat Leasows Solar Park (solar farm, 4.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.