Country England and Wales › Region West Midlands › Council Telford and Wrekin › Neighbourhood Wrockwardine Wood & Trench › Postcode TF2 6QB What's changing near TF2 6QB Within 2 km, around Wrockwardine Wood & Trench in Telford and Wrekin. Building, planning, schools, transport, prices and crime.
449 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-1.3% like-for-like prices in Wrockwardine Wood & Trench, 2024 → 2025 (council +1.7%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 12 new homes completed houses · Jan 2025 – Sep 2026
Sept 2026 1.5 km away New homes 38 new homes completed houses · Dec 2024 – Sep 2026
Sept 2026 1.6 km away New homes 19 new homes completed 4 flats, 15 houses · Aug 2026
Aug 2026 1.3 km away New homes 84 new homes completed houses · Nov 2024 – May 2026
May 2026 1.7 km away New homes 23 new homes completed houses · Jan 2026 – Mar 2026
Mar 2026 1.6 km away New homes 25 new homes completed houses · Jun 2025 – Dec 2025
Dec 2025 1.9 km away New homes 9 new homes completed houses · Nov 2025
Nov 2025 1.8 km away New homes 35 new homes completed houses · Apr 2025 – Nov 2025
Nov 2025 1.8 km away New homes 13 new homes completed houses · Aug 2025 – Nov 2025
Nov 2025 1.4 km away New homes 21 new homes completed houses · Apr 2025 – Sep 2025
Sept 2025 1.7 km away New homes 12 new homes completed houses · Nov 2024 – Aug 2025
Aug 2025 1.9 km away New homes 76 new homes completed flats · Jul 2025
Jul 2025 1.8 km away 6 homes extended 2021–2025, typically adding 28 m²
11 since energy certificates began (2008)
2 in TF2 6QB itself
Extended certificate 2025 Extended certificate 2014 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 4 storm overflows within 2 km
45 hours of spills in 2025 between them (typical neighbourhood: about 36)
42 spill events counted
Severn Trent Water Royal Exchange Car Park Cso into Hortonwood Open Channel 24 spills, 23 hours in 2025
1.2 km away Severn Trent Water Hortonwood Trench Cso into Tributary Of Crow Brook 16 spills, 21 hours in 2025
1.8 km away Severn Trent Water Telford - Richmond Avenue (Cso) into Crow Brook 1 spills, 0 hours in 2025
1.8 km away Severn Trent Water Royal Exchange Car Park Cso into Hortonwood Open Channel 1 spills, 0 hours in 2025
1.2 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 32 planned, approved or being built and 9 running (42 MW between them). Those within 5 km are on the map above.
Rooftop solar Makita Manufacturing Europe - Solar Photovoltaic Panels Approved, not yet built · 390 kW
Jul 2022 1.3 km away Rooftop solar Makita Manufacturing Europe - Solar Panels Approved, not yet built · 170 kW
Jan 2025 1.3 km away Rooftop solar Kraft Heinz, Hortonwood - Solar Panels Approved, not yet built · 810 kW
Apr 2026 1.4 km away Rooftop solar Cherwell Enterprise Park, Hortonwood 2 -Solar Panels Planning application in · 160 kW
May 2026 1.5 km away Rooftop solar Lyreco, Donnington Wood - Solar Panels Approved, not yet built · 4 MW
Dec 2025 2.0 km away Battery storage Hortonwood - Energy Storage Facility Approved, not yet built · 200 kW
Jul 2025 2.0 km away Rooftop solar Parkside Court - Solar Panels & Air Source Heat Pumps Approved, not yet built · 270 kW
Aug 2022 3.1 km away Battery storage Ercall House, Stafford Park - Micro Energy Storage Facility Approved, not yet built · 200 kW
Aug 2025 3.2 km away Rooftop solar Furrows Ford Store, Furrows Business Park - Solar Panels Approved, not yet built · 270 kW
Sept 2024 3.2 km away Solar farm Telford Shopping Centre - Solar Photovoltaic PV Array Approved, not yet built · 2 MW
Jan 2022 3.2 km away Road and street works within 1 km 2 permitted works running now or planned, 2 of them major.
Major, planned Juniper Drive Footpath 22, Telford Utility repair and maintenance works · SEVERN TRENT WATER · No carriageway incursion
Nov 2026 to Nov 2026 350 m away Major Juniper Drive Footpath 22, Telford Utility repair and maintenance works · SEVERN TRENT WATER · No carriageway incursion
Nov 2026 to Nov 2026 350 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2020 22.4 km away Decided decided Mar 2014 25.3 km away Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 25.9 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lyreco - Telford Distribution Centre (rooftop solar, 2.0 km); Granville Road Solar Farm (solar farm, 2.7 km); Wheat Leasows Solar Park (solar farm, 2.9 km); Granville Landfill Site (landfill gas, 2.9 km); Ricoh UK Products (solar farm, 3.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.