What's changing near TF2 6AA
Within 2 km, around Oakengates & Ketley in Telford and Wrekin. Building, planning, schools, transport, prices and crime.
404new homes completed within 2 km, last 2 years
82homes given permission on brownfield sites since 2021
+2.8%like-for-like prices in Oakengates & Ketley, 2024 → 2025 (council +1.7%)
0%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
14 new homes completedhouses · Oct 2024 – Sep 2026
Sept 2026
1.3 km away - New homes
39 new homes completedhouses · Oct 2024 – Sep 2026
Sept 2026
1.3 km away - New homes
85 new homes completedhouses · Oct 2024 – May 2026
May 2026
1.9 km away - New homes
23 new homes completedhouses · Jan 2026 – Mar 2026
Mar 2026
1.5 km away - New homes
84 new homes completedflats · Mar 2026
Mar 2026
1.8 km away - New homes
25 new homes completedhouses · Jun 2025 – Dec 2025
Dec 2025
750 m away - New homes
9 new homes completedhouses · Nov 2025
Nov 2025
1.9 km away - New homes
35 new homes completedhouses · Apr 2025 – Nov 2025
Nov 2025
1.9 km away - New homes
13 new homes completedhouses · Aug 2025 – Nov 2025
Nov 2025
950 m away - New homes
10 new homes completedflats · Oct 2024 – Oct 2025
Oct 2025
100 m away - New homes
21 new homes completedhouses · Apr 2025 – Sep 2025
Sept 2025
1.9 km away - New homes
5 new homes completedhouses · Apr 2025 – Aug 2025
Aug 2025
1.4 km away
5homes extended 2021–2025, typically adding 31 m²
7since energy certificates began (2008)
2in TF2 6AA itself
- Extendedcertificate 2025
- Extendedcertificate 2020
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
31 planned, approved or being built and 9 running (42 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Parkside Court - Solar Panels & Air Source Heat PumpsApproved, not yet built · 270 kW
Aug 2022
1.9 km away - Solar farm
Telford Shopping Centre - Solar Photovoltaic PV ArrayApproved, not yet built · 2 MW
Jan 2022
2.0 km away - Rooftop solar
Telford Shopping Centre, Woodhouse Central - Solar Photovoltaic PanelsApproved, not yet built · 700 kW
Sept 2023
2.0 km away - Battery storage
Ercall House, Stafford Park - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Aug 2025
2.0 km away - Rooftop solar
Telford Shopping Centre, Northfield Street - Solar PanelsApproved, not yet built · 580 kW
Mar 2026
2.2 km away - Battery storage
Radford House - Energy Storage FacilityApproved, not yet built · 200 kW
Sept 2025
2.2 km away - Rooftop solar
Lyreco, Donnington Wood - Solar PanelsApproved, not yet built · 4 MW
Dec 2025
2.3 km away - Rooftop solar
Telford Ten Pin, International Way - Solar PV PanelsApproved, not yet built · 230 kW
Oct 2023
2.3 km away - Rooftop solar
Makita Manufacturing Europe - Solar Photovoltaic PanelsApproved, not yet built · 390 kW
Jul 2022
2.4 km away - Rooftop solar
Makita Manufacturing Europe - Solar PanelsApproved, not yet built · 170 kW
Jan 20252.4 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
- Major, planned
Hartshill Avenue, TelfordHighway improvement works · TELFORD & WREKIN COUNCIL · Some carriageway incursion
Dec 2026 to Jan 2027
650 m away - Standard
Walker Crescent, TelfordUtility asset works · National Grid Electricity Distribution (West Midlands) · Some carriageway incursion
Oct 2026 to Oct 2026
700 m away - Standard
Gower Street, TelfordDisconnection or alteration of supply · CADENT GAS LIMITED · Two-way signals
Oct 2026 to Oct 2026
1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2020
22.2 km away - Decided
M54 to M6 Link RoadHighways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022
25.6 km away - Decideddecided Mar 2014
26.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lyreco - Telford Distribution Centre (rooftop solar, 2.3 km); Ricoh UK Products (solar farm, 2.6 km); Granville Road Solar Farm (solar farm, 3.0 km); Granville Landfill Site (landfill gas, 3.0 km); Wheat Leasows Solar Park (solar farm, 3.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.