Country England and Wales › Region West Midlands › Council Telford and Wrekin › Neighbourhood Hadley & Horton › Postcode TF1 5LT What's changing near TF1 5LT Within 2 km, around Hadley & Horton in Telford and Wrekin. Building, planning, schools, transport, prices and crime.
188 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+2.4% like-for-like prices in Hadley & Horton, 2024 → 2025 (council +1.7%)
-12% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 84 new homes completed houses · Nov 2024 – May 2026
May 2026 450 m away New homes 9 new homes completed houses · Nov 2025
Nov 2025 600 m away New homes 35 new homes completed houses · Apr 2025 – Nov 2025
Nov 2025 550 m away New homes 21 new homes completed houses · Apr 2025 – Sep 2025
Sept 2025 500 m away New homes 12 new homes completed houses · Dec 2024 – Apr 2025
Apr 2025 400 m away New homes 5 new homes completed houses · Nov 2024 – Jan 2025
Jan 2025 500 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
8 homes extended 2021–2025, typically adding 32 m²
13 since energy certificates began (2008)
1 in TF1 5LT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 32 planned, approved or being built and 9 running (42 MW between them). Those within 5 km are on the map above.
Rooftop solar Kraft Heinz, Hortonwood - Solar Panels Approved, not yet built · 810 kW
Apr 2026 900 m away Rooftop solar Cherwell Enterprise Park, Hortonwood 2 -Solar Panels Planning application in · 160 kW
May 2026 1000 m away Rooftop solar Makita Manufacturing Europe - Solar Photovoltaic Panels Approved, not yet built · 390 kW
Jul 2022 1.1 km away Rooftop solar Makita Manufacturing Europe - Solar Panels Approved, not yet built · 170 kW
Jan 2025 1.1 km away Rooftop solar Furrows Ford Store, Furrows Business Park - Solar Panels Approved, not yet built · 270 kW
Sept 2024 1.8 km away Battery storage Hortonwood - Energy Storage Facility Approved, not yet built · 200 kW
Jul 2025 2.2 km away Rooftop solar Princess Royal Hospital, Grainger Drive - Solar PV Panels Approved, not yet built · 2 MW
Jun 2026 2.8 km away Solar farm New Works Lane - Solar Farm Planning application in · 30 MW
Jul 2021 3.0 km away Rooftop solar Parkside Court - Solar Panels & Air Source Heat Pumps Approved, not yet built · 270 kW
Aug 2022 3.2 km away Rooftop solar Lyreco, Donnington Wood - Solar Panels Approved, not yet built · 4 MW
Dec 2025 3.3 km away Road and street works within 1 km 4 permitted works running now or planned, 3 of them major.
Major, planned Church Street, Telford Highway improvement works · TELFORD & WREKIN COUNCIL · Road closure
Dec 2026 to Dec 2026 500 m away Major, planned Manse Road, Telford Highway improvement works · TELFORD & WREKIN COUNCIL · Road closure
Dec 2026 to Dec 2026 850 m away Major, planned Holyhead Road, Telford Highway improvement works · TELFORD & WREKIN COUNCIL · Road closure
Jan 2027 to Jan 2027 1000 m away Standard Broadway, Telford Utility asset works · National Grid Electricity Distribution (West Midlands) · Some carriageway incursion
Nov 2026 to Nov 2026 750 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2020 23.7 km away Decided decided Mar 2014 26.3 km away Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 27.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Wheat Leasows Solar Park (solar farm, 2.0 km); Lyreco - Telford Distribution Centre (rooftop solar, 3.4 km); Granville Road Solar Farm (solar farm, 4.0 km); Granville Landfill Site (landfill gas, 4.3 km); Ricoh UK Products (solar farm, 4.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.