What's changing near TF1 5JR
Within 2 km, around Hadley & Horton in Telford and Wrekin. Building, planning, schools, transport, prices and crime.
340new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.4%like-for-like prices in Hadley & Horton, 2024 → 2025 (council +1.7%)
-12%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
85 new homes completedhouses · Oct 2024 – May 2026
May 2026
1.0 km away - New homes
23 new homes completed5 flats, 18 houses · Mar 2025 – Jan 2026
Jan 2026
1.5 km away - New homes
24 new homes completed5 flats, 19 houses · Nov 2025 – Jan 2026
Jan 2026
1.6 km away - New homes
20 new homes completed8 flats, 12 houses · Mar 2025 – Dec 2025
Dec 2025
1.5 km away - New homes
11 new homes completedflats · Dec 2025
Dec 2025
1.9 km away - New homes
66 new homes completedflats · Dec 2025
Dec 2025
1.2 km away - New homes
9 new homes completedhouses · Nov 2025
Nov 2025
900 m away - New homes
35 new homes completedhouses · Apr 2025 – Nov 2025
Nov 2025
1000 m away - New homes
10 new homes completedhouses · Oct 2025
Oct 2025
1.3 km away - New homes
9 new homes completedflats · Oct 2025
Oct 2025
1.9 km away - New homes
21 new homes completedhouses · Apr 2025 – Sep 2025
Sept 2025
1.0 km away - New homes
12 new homes completedhouses · Dec 2024 – Apr 2025
Apr 2025
1.1 km away
3homes extended 2021–2025, typically adding 20 m²
9since energy certificates began (2008)
1in TF1 5JR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
15hours of spills in 2025 between them (typical neighbourhood: about 36)
28spill events counted
- Severn Trent Water
Bucks Head Csointo Hurley Brook Via Sws28 spills, 15 hours in 2025
700 m away - Severn Trent Water
Wellington - Urban Gardens (Cso)into Hurley Brook 0 spills, 0 hours in 2025
750 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
35 planned, approved or being built and 9 running (42 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Furrows Ford Store, Furrows Business Park - Solar PanelsApproved, not yet built · 270 kW
Sept 2024
500 m away - Solar farm
New Works Lane - Solar FarmPlanning application in · 30 MW
Jul 2021
1.9 km away - Rooftop solar
Princess Royal Hospital, Grainger Drive - Solar PV PanelsApproved, not yet built · 2 MW
Jun 2026
1.9 km away - Rooftop solar
Kraft Heinz, Hortonwood - Solar PanelsApproved, not yet built · 810 kW
Apr 2026
1.9 km away - Rooftop solar
Cherwell Enterprise Park, Hortonwood 2 -Solar PanelsPlanning application in · 160 kW
May 2026
2.0 km away - Rooftop solar
Makita Manufacturing Europe - Solar Photovoltaic PanelsApproved, not yet built · 390 kW
Jul 2022
2.3 km away - Rooftop solar
Makita Manufacturing Europe - Solar PanelsApproved, not yet built · 170 kW
Jan 2025
2.3 km away - Solar farm
Steeraway Farm - Solar FarmBeing built · 30 MW
Sept 2025
2.4 km away - Battery storage
Hortonwood - Energy Storage FacilityApproved, not yet built · 200 kW
Jul 2025
3.3 km away - Rooftop solar
Parkside Court - Solar Panels & Air Source Heat PumpsApproved, not yet built · 270 kW
Aug 2022
3.5 km away
Road and street works within 1 km
13 permitted works running now or planned, 11 of them major.
- Major
Crescent Road, TelfordUtility asset works · CADENT GAS LIMITED · Road closure
Sept 2026 to Oct 2026
200 m away - Major, planned
Manse Road, TelfordHighway improvement works · TELFORD & WREKIN COUNCIL · Road closure
Dec 2026 to Dec 2026
650 m away - Major, planned
Windsor Road, TelfordUtility asset works · CADENT GAS LIMITED · Multi-way signals
Dec 2026 to Dec 2026
800 m away - Major, planned
Arleston Avenue, TelfordUtility asset works · CADENT GAS LIMITED · Multi-way signals
Dec 2026 to Dec 2026
900 m away - Major
Arleston Avenue, TelfordUtility asset works · CADENT GAS LIMITED · Multi-way signals
Oct 2026 to Oct 2026
900 m away - Major, planned
Church Street, TelfordHighway improvement works · TELFORD & WREKIN COUNCIL · Road closure
Dec 2026 to Dec 2026
900 m away - Major, planned
Manor Rise, TelfordUtility asset works · CADENT GAS LIMITED · Multi-way signals
Dec 2026 to Jan 2027
900 m away - Major
Manor Rise, TelfordUtility asset works · CADENT GAS LIMITED · Multi-way signals
Sept 2026 to Oct 2026
900 m away - Major, planned
Toll Road, TelfordUtility asset works · CADENT GAS LIMITED · Multi-way signals
Dec 2026 to Dec 2026
950 m away - Major, planned
Major infrastructure projects within 30 km
- Decideddecided May 2020
25.0 km away - Decideddecided Mar 2014
27.6 km away - Decided
M54 to M6 Link RoadHighways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022
28.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Wheat Leasows Solar Park (solar farm, 2.2 km); Candles/Coalmoor Landfill (landfill gas, 3.9 km); Lyreco - Telford Distribution Centre (rooftop solar, 4.7 km); Rushmoor Lane Farm (Cheshire Coppice) (solar farm, 5.1 km); Ricoh UK Products (solar farm, 5.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.