Country England and Wales › Region West Midlands › Council Shropshire › Neighbourhood Shifnal › Postcode TF11 8SD What's changing near TF11 8SD Within 2 km, around Shifnal in Shropshire. Building, planning, schools, transport, prices and crime.
15 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+2.3% like-for-like prices in Shifnal, 2024 → 2025 (council +3.0%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
0 homes extended 2021–2025
0 since energy certificates began (2008)
0 in TF11 8SD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 24 planned, approved or being built and 10 running (61 MW between them). Those within 5 km are on the map above.
Rooftop solar TCL Packaging, Stafford Park - Solar Panels Approved, not yet built · 530 kW
Apr 2025 4.2 km away Solar farm Kemberton - Solar Farm Approved, not yet built · 22 MW
Feb 2024 4.2 km away Battery storage Stafford Park - Battery Energy Storage Approved, not yet built · 200 kW
Sept 2025 4.6 km away Rooftop solar Mail Solutions - Solar Panels Planning application in · 600 kW
May 2024 4.8 km away Battery storage Radford House - Energy Storage Facility Approved, not yet built · 200 kW
Sept 2025 5.1 km away Energy from waste Halesfield - Energy Facility Approved, not yet built · 15 MW
Sept 2021 5.2 km away Battery storage Ercall House, Stafford Park - Micro Energy Storage Facility Approved, not yet built · 200 kW
Aug 2025 5.4 km away Rooftop solar Wz Packaging, Halesfield - Solar Panels Approved, not yet built · 520 kW
Jul 2022 5.5 km away Rooftop solar Telford Ten Pin, International Way - Solar PV Panels Approved, not yet built · 230 kW
Oct 2023 6.1 km away Rooftop solar Telford Shopping Centre, Northfield Street - Solar Panels Approved, not yet built · 580 kW
Mar 2026 6.1 km away Road and street works within 1 km 2 permitted works running now or planned, 1 of them major.
Major, planned Greenfields, Shifnal Highway improvement works · SHROPSHIRE COUNCIL · Give and take
Dec 2026 to Jan 2027 950 m away Minor Lamledge Lane, Shifnal New service connection · SEVERN TRENT WATER · Two-way signals
Oct 2026 to Nov 2026 350 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2020 16.1 km away Decided M54 to M6 Link Road Highways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone decided Apr 2022 18.9 km away Decided decided Mar 2014 25.6 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Telford Shopping Centre, Woodhouse Central - Solar Photovoltaic Panels Approved, not yet built · 700 kW
Running nearest: Ricoh UK Products (solar farm, 4.6 km); Sheriffhales Solar Farm (solar farm, 4.9 km); Granville Landfill Site (landfill gas, 5.8 km); Granville Road Solar Farm (solar farm, 6.3 km); Lyreco - Telford Distribution Centre (rooftop solar, 6.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.