39new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.2%like-for-like prices in Wembdon & Chilton Trinity, 2024 → 2025 (council +1.3%)
-10%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
12homes extended 2021–2025, typically adding 24 m²
22since energy certificates began (2008)
3in TA6 7JP itself
- Extendedcertificate 2026
- Extendedcertificate 2023
- Extendedcertificate 2016
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
13 planned, approved or being built and 12 running (76 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Morrisons, Broadway - Solar PV PanelsApproved, not yet built · 360 kW
Feb 2024
2.0 km away - Rooftop solar
Novolex, Brue Avenue - Solar PanelsApproved, not yet built · 1 MW
Aug 2025
2.7 km away - Solar farm
Saltlands Avenue - Solar ParksPlanning application in · 9 MW
Jan 2022
3.4 km away - Battery storage
Saltlands Avenue -Battery StoragePlanning application in
Jan 2022
3.4 km away - Solar farm
Cannington - Solar PanelsApproved, not yet built · 4 MW
May 2022
3.6 km away - Energy from waste
Showground RoadBeing built · 8 MW
Jul 2019
3.6 km away - Energy from waste
Showground Road, Bridgwater Energy Recovery FacilityPlanning application in · 8 MW
Oct 2020
3.6 km away - Rooftop solar
Butcombe Beer Store, The Polden Business Centre - Solar PanelsApproved, not yet built · 260 kW
Mar 2023
4.4 km away - Battery storage
Summerway Drove, East Bower - Battery StorageApproved, not yet built · 90 MW
Feb 2025
4.7 km away - Solar farm
Impens Farm - Solar Farm & Battery StorageApproved, not yet built · 50 MW
Dec 2022
5.5 km away - Battery storage
Impens Farm - Solar Farm & Battery Storage
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
- Major, planned
Footway Between Rosary Drive And Durleigh Road, BridgwaterUtility repair and maintenance works · WESSEX WATER · Road closure
Nov 2026 to Dec 2026
250 m away - Major
Footway Between Rosary Drive And Durleigh Road, BridgwaterUtility repair and maintenance works · WESSEX WATER · Road closure
Nov 2026 to Dec 2026
250 m away - Standard
Hawkridge Road, BridgwaterNew service connection · National Grid Electricity Distribution (South West) · Some carriageway incursion
Oct 2026 to Oct 2026
200 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due January 2027
7.6 km away - Decideddecided Mar 2013
11.3 km away - Pre-application
Hinkley Point C Connection Project Material ChangeElectric Lines · The Project proposes permanent access infrastructure for the purpose of maintenance access and operation at locations between Bridgwater and Seabank, in the administrative boundaries of Bristol City, North Somerset, Somerset and South Gloucestershire Councils. application due January 2028
27.5 km away - Decideddecided Jan 2016
29.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Cobbs Cross Solar Park (solar farm, 1.4 km); Park Wall Solar Park (solar farm, 4.4 km); Summerway Drove (solar farm, 4.8 km); Cannington Cold Stores (anaerobic digestion, 4.9 km); Horsey Levels - Solar Farm (solar farm, 5.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.