Within 2 km, around Bridgwater East in Somerset. Building, planning, schools, transport, prices and crime.
388new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.0%like-for-like prices in Bridgwater East, 2024 → 2025 (council +1.3%)
+33%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
44 new homes completedhouses · Oct 2025 – Oct 2026
Oct 2026
750 m away - New homes
41 new homes completedhouses · Oct 2024 – Sep 2026
Sept 2026
1.2 km away - New homes
28 new homes completedhouses · Dec 2025 – Jul 2026
Jul 2026
1.2 km away - New homes
19 new homes completedhouses · Nov 2025 – Jul 2026
Jul 2026
1.1 km away - New homes
5 new homes completedflats · May 2026
May 2026
1.4 km away - New homes
24 new homes completedhouses · Feb 2026 – Apr 2026
Apr 2026
850 m away - New homes
58 new homes completedhouses · Jun 2025 – Apr 2026
Apr 2026
1.2 km away - New homes
12 new homes completedhouses · Nov 2025 – Dec 2025
Dec 2025
1.2 km away - New homes
27 new homes completedhouses · May 2025 – Nov 2025
Nov 2025
1.4 km away - New homes
14 new homes completedhouses · Jun 2025 – Nov 2025
Nov 2025
1.4 km away - New homes
11 new homes completedhouses · Aug 2025 – Oct 2025
Oct 2025
850 m away - New homes
8 new homes completedhouses · Sep 2025
Oct 2025
1.1 km away
7homes extended 2021–2025, typically adding 46 m²
13since energy certificates began (2008)
0in TA6 4UN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
56hours of spills in 2025 between them (typical neighbourhood: about 36)
46spill events counted
- Wessex Water
Chilton Street(Saltlands) Psinto River Parrett(Tidal)(E) · near bathing water: Burnham Jetty North15 spills, 28 hours in 2025
1.8 km away - Wessex Water
East Quay Pumping Stationinto River Parrett (E) · near bathing water: Burnham Jetty North22 spills, 15 hours in 2025
1.8 km away - Wessex Water
Pumping Station At Bristol Roadinto River Parrett (Estuarine) · near bathing water: Burnham Jetty North8 spills, 9 hours in 2025
1.2 km away - Wessex Water
West Quay Psinto River Parrett (E) · near bathing water: Burnham Jetty North1 spills, 5 hours in 2025
1.8 km away - Wessex Water
Bath Road Psinto Bath Road Rhyne(S)0 spills, 0 hours in 2025
1.3 km away - Wessex Water
Blake Gardens Psinto River Parrett (Estuarine) · near bathing water: Burnham Jetty North0 spills, 0 hours in 2025
1.9 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
13 planned, approved or being built and 11 running (71 MW between them). Those within 5 km are on the map above.
- Battery storage
Summerway Drove, East Bower - Battery StorageApproved, not yet built · 90 MW
Feb 2025
1.2 km away - Solar farm
Saltlands Avenue - Solar ParksPlanning application in · 9 MW
Jan 2022
1.4 km away - Battery storage
Saltlands Avenue -Battery StoragePlanning application in
Jan 2022
1.4 km away - Rooftop solar
Butcombe Beer Store, The Polden Business Centre - Solar PanelsApproved, not yet built · 260 kW
Mar 2023
1.9 km away - Rooftop solar
Novolex, Brue Avenue - Solar PanelsApproved, not yet built · 1 MW
Aug 2025
2.1 km away - Rooftop solar
Morrisons, Broadway - Solar PV PanelsApproved, not yet built · 360 kW
Feb 2024
2.3 km away - Energy from waste
Showground RoadBeing built · 8 MW
Jul 2019
3.0 km away - Energy from waste
Showground Road, Bridgwater Energy Recovery FacilityPlanning application in · 8 MW
Oct 2020
3.0 km away - Solar farm
Impens Farm - Solar Farm & Battery StorageApproved, not yet built · 50 MW
Dec 2022
6.6 km away - Battery storage
Impens Farm - Solar Farm & Battery StorageApproved, not yet built
Dec 2022
6.6 km away - Solar farm
Road and street works within 1 km
5 permitted works running now or planned, 4 of them major.
- Major
Bower Lane, BridgwaterUtility asset works · Indigo Power · Two-way signals
Oct 2026 to Nov 2026
350 m away - Major
Bower Lane, BridgwaterUtility asset works · Indigo Power · Road closure
Oct 2026 to Nov 2026
600 m away - Major
Bower Lane, BridgwaterUtility asset works · Indigo Power · Road closure
Nov 2026 to Nov 2026
650 m away - Major
Old Bath Road, BridgwaterUtility asset works · Indigo Power · Some carriageway incursion
Sept 2026 to Jan 2027
900 m away - Standard
Little Sydenham Farm Road, BridgwaterUtility asset works · Indigo Power · Priority working
Oct 2026 to Oct 2026
750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due January 2027
11.4 km away - Decideddecided Mar 2013
13.2 km away - Pre-application
Hinkley Point C Connection Project Material ChangeElectric Lines · The Project proposes permanent access infrastructure for the purpose of maintenance access and operation at locations between Bridgwater and Seabank, in the administrative boundaries of Bristol City, North Somerset, Somerset and South Gloucestershire Councils. application due January 2028
24.6 km away - Decideddecided Jan 2016
26.1 km away - Decideddecided Jan 2021
28.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Summerway Drove (solar farm, 1.7 km); Park Wall Solar Park (solar farm, 1.9 km); Horsey Levels - Solar Farm (solar farm, 2.8 km); Puriton Solar Farm (solar farm, 4.4 km); Puriton Landfill Solar Farm (solar farm, 4.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.