Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
62hours of spills in 2025 between them (typical neighbourhood: about 36)
26spill events counted
Wessex Water
Taunton Road Psinto River Parrett(Tidal)(E) · near bathing water: Burnham Jetty North15 spills, 34 hours in 2025
1.5 km away
Wessex Water
Colley Lane Pumping Stationinto River Parrett(E) · near bathing water: Burnham Jetty North11 spills, 28 hours in 2025
Hinkley Point C Connection Project Material ChangeElectric Lines · The Project proposes permanent access infrastructure for the purpose of maintenance access and operation at locations between Bridgwater and Seabank, in the administrative boundaries of Bristol City, North Somerset, Somerset and South Gloucestershire Councils.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Stockmoor & North Petherton: +25% over five years (2020 → 2025).
Council tax list: 100 homes added in the neighbourhood since April 2024.
Population (GP registrations): +1.8% in two years.