What's changing near TA2 8PS
Within 2 km, around Taunton Rowbarton & Kingston in Somerset. Building, planning, schools, transport, prices and crime.
115new homes completed within 2 km, last 2 years
37homes given permission on brownfield sites since 2021
-2.3%like-for-like prices in Taunton Rowbarton & Kingston, 2024 → 2025 (council +1.3%)
-19%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
10 new homes completedhouses · May 2026 – Sep 2026
Sept 2026
1.5 km away - New homes
14 new homes completed3 flats, 11 houses · Apr 2026 – Jun 2026
Jun 2026
1.6 km away - New homes
12 new homes completedhouses · Mar 2026 – Jun 2026
Jun 2026
1.4 km away - New homes
15 new homes completedhouses · Dec 2025 – Jun 2026
Jun 2026
1.4 km away - New homes
7 new homes completedhouses · Dec 2025 – May 2026
May 2026
1.4 km away - New homes
26 new homes completedhouses · Oct 2024 – Mar 2026
Mar 2026
1.9 km away - New homes
6 new homes completedflats · Dec 2025
Dec 2025
1.1 km away - New homes
8 new homes completedflats · Dec 2024 – Feb 2025
Feb 2025
1.1 km away - New schoolDec 2023
950 m away - Planning permissionAug 2023
1.4 km away - Planning permission
1homes extended 2021–2025, typically adding 18 m²
2since energy certificates began (2008)
0in TA2 8PS itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
838hours of spills in 2025 between them (typical neighbourhood: about 36)
97spill events counted
- Wessex Water
Priory Storm Tanksinto River Tone(S)33 spills, 336 hours in 2025
1.5 km away - Wessex Water
Priory Storm Tanksinto River Tone(S)19 spills, 175 hours in 2025
1.5 km away - Wessex Water
Hyde Lane Pumping Stationinto River Tone19 spills, 151 hours in 2025
850 m away - Wessex Water
Allens Brook Csointo Allen'S Brook17 spills, 144 hours in 2025
1.5 km away - Wessex Water
Maidenbrook Lane Csointo Trib Of Old River Tone8 spills, 30 hours in 2025
1.3 km away - Wessex Water
Taunton Market Csointo River Tone1 spills, 1 hours in 2025
2.0 km away - Wessex Water
Maidenbrook Pumping Stationinto River Tone0 spills, 0 hours in 2025
600 m away - Wessex Water
Bridgwater Road Csointo Tributary Of The River Tone0 spills, 0 hours in 2025
950 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
15 planned, approved or being built and 9 running (56 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Crown Industrial Estate, Venture Way - Solar PanelsApproved, not yet built · 700 kW
Jan 2023
550 m away - Rooftop solar
Hollywood Bowl - Solar Voltaic EquipmentApproved, not yet built · 180 kW
Jan 2022
850 m away - Rooftop solar
Rivergate House - Solar PanelsApproved, not yet built · 150 kW
Nov 2023
1.7 km away - Solar farm
Bull Street, Creech St Michael - Solar FarmPlanning application in · 34 MW
Jun 2025
2.9 km away - Solar farm
Ham Farm, Creech St Michael - Solar ArrayApproved, not yet built · 20 MW
Jun 2024
3.9 km away - Battery storage
Ham Farm, Creech St Michael - Battery Energy Storage SystemApproved, not yet built
Jun 2024
3.9 km away - Rooftop solar
St Margarets Hospice, Heron Drive - Solar PanelsApproved, not yet built · 150 kW
Jan 2023
4.0 km away - Rooftop solar
Growth Technology Limited, Norton Fitzwarren - Solar PanelsApproved, not yet built · 240 kW
Mar 2023
4.3 km away - Battery storage
Shearston, North Petherton - Battery StorageApproved, not yet built
Aug 2022
5.5 km away - Battery storage
Taunton Substation - Battery StoragePlanning application in
Jul 2022
5.8 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due January 2027
12.7 km away - Decideddecided Mar 2013
20.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Taunton Racecourse (solar farm, 4.1 km); Lower Marsh Farm (solar farm, 5.0 km); Higher Knapp Farm (solar farm, 5.5 km); Fideoak Mills (battery storage, 5.8 km); Montys Farm (solar farm, 6.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.