What's changing near TA1 5JP
Within 2 km, around Bishop's Hull & Norton Fitzwarren in Somerset. Building, planning, schools, transport, prices and crime.
206new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.3%like-for-like prices in Bishop's Hull & Norton Fitzwarren, 2024 → 2025 (council +1.3%)
+16%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
26 new homes completedhouses · Aug 2025 – Oct 2026
planned Oct 2026
550 m away - New homes
24 new homes completed4 flats, 20 houses · Jul 2025 – Sep 2026
Sept 2026
450 m away - New homes
12 new homes completedhouses · Aug 2025 – Jun 2026
Jun 2026
550 m away - New homes
5 new homes completedhouses · Jun 2026
Jun 2026
550 m away - New homes
13 new homes completedhouses · Mar 2025 – Jun 2026
Jun 2026
350 m away - New homes
32 new homes completed2 flats, 30 houses · Sep 2025 – May 2026
May 2026
700 m away - New homes
11 new homes completedhouses · Apr 2025 – Jan 2026
Jan 2026
700 m away - New homes
27 new homes completedhouses · Nov 2024 – Jan 2026
Jan 2026
600 m away - New homes
6 new homes completedhouses · Jul 2025
Aug 2025
550 m away - New homes
21 new homes completedhouses · Dec 2024 – Jun 2025
Jun 2025
350 m away - New homes
7 new homes completedhouses · Jan 2025
Jan 2025
600 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 21 postcodes nearby had new homes completed in the last two years.
8homes extended 2021–2025, typically adding 31 m²
13since energy certificates began (2008)
3in TA1 5JP itself
- Extendedcertificate 2026
- Extendedcertificate 2025
- Extendedcertificate 2016
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
22hours of spills in 2025 between them (typical neighbourhood: about 36)
12spill events counted
- Wessex Water
Mountway Bishops Hull Csointo River Tone · near bathing water: River Tone at French Weir Park11 spills, 20 hours in 2025
1.5 km away - Wessex Water
1a Shutewater Close Pumping Stationinto Trib Of River Tone Via Sws · near bathing water: River Tone at French Weir Park1 spills, 2 hours in 2025
950 m away - Wessex Water
Rumwell Sewage P. Stninto Unnamed Stream0 spills, 0 hours in 2025
600 m away - Wessex Water
Newbarn Park Csointo Galmington Stream Via Sws0 spills, 0 hours in 2025
900 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
17 planned, approved or being built and 12 running (81 MW between them). Those within 5 km are on the map above.
- Rooftop solar
St Margarets Hospice, Heron Drive - Solar PanelsApproved, not yet built · 150 kW
Jan 2023
1.4 km away - Battery storage
Hele Manor Farm, Bradford On Tone - Battery Storage SystemApproved, not yet built · 20 MW
Apr 2023
1.5 km away - Battery storage
Taunton Substation - Battery StoragePlanning application in
Jul 2022
1.6 km away - Rooftop solar
Growth Technology Limited, Norton Fitzwarren - Solar PanelsApproved, not yet built · 240 kW
Mar 2023
2.2 km away - Rooftop solar
Crown Industrial Estate, Venture Way - Solar PanelsApproved, not yet built · 700 kW
Jan 2023
4.9 km away - Rooftop solar
VPK Wellington, Chelston Business Park - Solar PanelApproved, not yet built · 2 MW
Aug 2025
5.0 km away - Rooftop solar
Rivergate House - Solar PanelsApproved, not yet built · 150 kW
Nov 2023
5.3 km away - Rooftop solar
Hollywood Bowl - Solar Voltaic EquipmentApproved, not yet built · 180 kW
Jan 2022
5.6 km away - Rooftop solar
Blagroves Farm, Blagroves Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2023
5.9 km away - Solar farm
The Village Of Halse - Solar ArrayApproved, not yet built · 25 MW
Jan 2024
6.4 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due January 2027
14.3 km away - Decideddecided Mar 2013
22.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Fideoak Mills (battery storage, 1.6 km); Montys Farm (solar farm, 3.1 km); New Rendy Farm (solar farm, 4.1 km); Taunton Racecourse (solar farm, 4.1 km); Poole Generation Plant (landfill gas, 5.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.