What's changing near SY5 8NT
Within 2 km, around Shrewsbury Copthorne & Bowbrook in Shropshire. Building, planning, schools, transport, prices and crime.
51new homes completed within 2 km, last 2 years
102homes given permission on brownfield sites since 2021
+3.8%like-for-like prices in Shrewsbury Copthorne & Bowbrook, 2024 → 2025 (council +3.0%)
+1%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
17 new homes completedhouses · May 2026 – Sep 2026
Sept 2026
1.4 km away - New homes
8 new homes completedhouses · May 2026 – Aug 2026
Aug 2026
1.4 km away - New homes
15 new homes completedhouses · Oct 2024 – Jul 2025
Jul 2025
1.1 km away - New homes
7 new homes completedhouses · Feb 2025 – Apr 2025
Apr 2025
1.7 km away - Planning permission
Permission for 76 homesLand At William Farr House, Mytton Oak Road, Shrewsbury, Shropshire, SY3 8XL (full planning permission) Feb 2024
1.2 km away - Planning permission
Permission for 26 homesSite Of Radbrook College, Radbrook Road, Shrewsbury, Shropshire, SY3 9BJ (full planning permission) Jan 2023
1.1 km away - New schoolSept 2022
800 m away - New schoolAug 2022
1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
1homes extended 2021–2025, typically adding 46 m²
2since energy certificates began (2008)
2in SY5 8NT itself
- Extendedcertificate 2023
- Extendedcertificate 2019
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
265hours of spills in 2025 between them (typical neighbourhood: about 36)
33spill events counted
- Severn Trent Water
Hookagate Pumping Stationinto Rea Brook24 spills, 220 hours in 2025
1.9 km away - Severn Trent Water
Hanwood Sewage Pumping Stationinto Rea Brook9 spills, 44 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
11 planned, approved or being built and 6 running (62 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Royal Shrewsbury Hospital, Mytton Oak Road - Solar PanelsApproved, not yet built · 750 kW
Mar 2025
1.6 km away - Solar farm
Royal Shrewsbury Hospital, Mytton Oak Road - Solar CanopyApproved, not yet built
Aug 2025
1.6 km away - Solar farm
Severn Hospice - Solar ArrayApproved, not yet built · 380 kW
Sept 2024
2.9 km away - Battery storage
Brassey Road - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Mar 2024
3.6 km away - Rooftop solar
Shrewsbury College - Solar PanelsApproved, not yet built · 650 kW
Feb 2026
4.8 km away - Rooftop solar
Caterpillar Factory, Lancaster Road - Solar PanelsApproved, not yet built · 370 kW
Jan 2025
5.4 km away - Rooftop solar
Benbow Business Park - Roof Monted Solar PV SystemApproved, not yet built · 200 kW
Nov 2023
6.5 km away - Battery storage
Battery Shrewsbury Substation, Uffington - Battery Energy StoragePlanning application in · 100 MW
Feb 2025
6.9 km away - Battery storage
Bridge Farm, Uffington - Battery Energy StorageApproved, not yet built · 8 MW
Apr 2023
6.9 km away - Solar farm
Berrington Farm - Solar ArrayApproved, not yet built · 30 MW
May 2025
7.3 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Mar 2020
18.0 km away - Pre-application
Green Gen Vyrnwy FranktonElectric Lines · From a substation approx 5km SW of Llanerfyl in Powys to a connection point near Lower Frankton. application due February 2027
27.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Betton Abbots (landfill gas, 5.6 km); Condover (Green Farm) (solar farm, 6.0 km); Battlefield EfW (energy from waste, 6.8 km); Sundorne Grove (solar farm, 7.2 km); Condover Airfield (solar farm, 8.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.