What's changing near SW19 1LR
Within 2 km, around Wimbledon Broadway South in Merton. Building, planning, schools, transport, prices and crime.
294new homes completed within 2 km, last 2 years
572homes given permission on brownfield sites since 2021
-7.7%like-for-like prices in Wimbledon Broadway South, 2024 → 2025 (council +2.1%)
-46%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
42 new homes completedflats · Oct 2026
Oct 2026
1.2 km away - New homes
52 new homes completedflats · Oct 2026
Oct 2026
1.2 km away - New homes
6 new homes completedhouses · Sep 2026
Sept 2026
1.6 km away - New homes
11 new homes completedflats · Feb 2026 – Sep 2026
Sept 2026
950 m away - New homes
7 new homes completedflats · Jun 2026
Jun 2026
1.7 km away - New homes
7 new homes completedflats · Jun 2026
Jun 2026
1.6 km away - New homes
7 new homes completedflats · Apr 2025 – Mar 2026
Mar 2026
1.0 km away - New homes
6 new homes completedflats · Dec 2025
Dec 2025
50 m away - New homes
19 new homes completedflats · Dec 2025
Dec 2025
1.1 km away - New homes
8 new homes completed7 flats, 1 houses · Nov 2024 – Nov 2025
Nov 2025
500 m away - New homes
9 new homes completedflats · Oct 2025
Oct 2025
1.8 km away - New homes
11 new homes completedflats · Sep 2025
Sept 2025
1.4 km away - New homes
Planning applications within 500 m
52applications in the last 12 months
28approved · 2 refused
20still being decided
335net new homes in approved schemes since 2023
- Application Under Consideration
15, STANLEY ROAD, SW19 8RESTORAGE ROOM - RAISING OF ROOF LEVEL.Merton 26/HOUSE/2074 · Householder
Sept 2026
400 m away - Application Under Consideration
29, KINGSWOOD ROAD, SW19 3NDErection of a full-width rear dormer extension over existing outrigger, with associated adjustment to the main ridge height; a single-storey flat-roof rear extension; a flat-roofed garden outbuilding; two front rooflights; and removal of the rear chimney.Merton 26/HOUSE/2012 · Householder
Sept 2026
300 m away - Application Under Consideration
119, GLADSTONE ROAD, SW19 1QSERECTION OF A SINGLE STOREY WRAPAROUND EXTENSION.Merton 26/HOUSE/1974 · Householder
Sept 2026
150 m away - Application Under Consideration
119, GLADSTONE ROAD, SW19 1QSFIRST-FLOOR REAR ROOF ALTERATION AND ENLARGEMENT OF THE EXISTING REAR DORMER, INCLUDING ASSOCIATED CHANGES TO REAR WINDOWS.Merton 26/HOUSE/1977 · Householder
Sept 2026
150 m away - Application Under Consideration
37, PALMERSTON ROAD, SW19 1PGPROPOSED PART GROUND FLOOR SIDE EXTENSIONMerton 26/HOUSE/1853 · Householder
Aug 2026
200 m away - Application Under Consideration
71, KINGSWOOD ROAD, SW19 3NDFAST TRACK -Partial demolition of the existing side addition and two-storey rear outrigger,Construction of a single-storey rear and side extension, Reconfiguration and enlargement of the existing two-storey rear outrigger, including the formation of a double-pitched roof , Reconstruction of the existing side addition, including new single and double-pitched roof forms, Construction of a rear dormeMerton 26/HOUSE/1809 · Householder
125homes extended 2021–2025, typically adding 32 m²
238since energy certificates began (2008)
2in SW19 1LR itself
- Extendedcertificate 2021
- Extendedcertificate 2021
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
114hours of spills in 2025 between them (typical neighbourhood: about 36)
71spill events counted
- Thames Water
Streatham & Balham Storm Relief Cinto Graveney51 spills, 92 hours in 2025
2.0 km away - Thames Water
Streatham & Balham Storm Relief Binto Graveney18 spills, 21 hours in 2025
2.0 km away - Thames Water
Cso At Longley Roadinto River Graveney2 spills, 2 hours in 2025
2.0 km away - Thames Water
Cso At Gap Road (Cemetery)into River Wandle0 spills, 0 hours in 2025
1.8 km away - Thames Water
Cso At Gap Road (Cemetery)into River Wandle0 spills, 0 hours in 2025
1.8 km away - Thames Water
Cso At Gap Road (Cemetery)into River Wandle0 spills, 0 hours in 2025
1.8 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
34 planned, approved or being built and 2 running (32 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Morden Road, South Wimbledon - Solar pv panelsApproved, not yet built · 150 kW
Aug 2024
850 m away - Rooftop solar
JJ Foodservice, South Wimbledon - Solar PanelsPlanning application in · 350 kW
Sept 2024
1.1 km away - Rooftop solar
Sainsburys Superstore, Merton High Street - Solar PanelsApproved, not yet built · 990 kW
Sept 2024
1.3 km away - Rooftop solar
David Lloyd Club, Bushey Road - Solar PanelsApproved, not yet built · 800 kW
Sept 2023
1.6 km away - Rooftop solar
Grosvenor Wing, St Georges Hospital - Solar PanelsApproved, not yet built
Feb 2026
2.0 km away - Rooftop solar
Springfield University Hospital - Solar PanelsApproved, not yet built
May 2026
3.1 km away - Rooftop solar
Wyvern Estate, Beverley Way - Solar PanelsApproved, not yet built · 170 kW
Oct 2022
3.5 km away - Rooftop solar
St Anthonys Hospital, London Road - Solar PanelsApproved, not yet built · 240 kW
Jun 2024
4.3 km away - Rooftop solar
Kimpton Park Way - Solar Pv PanelsPlanning application in · 180 kW
Aug 2023
4.4 km away - Rooftop solar
Streatham Ice & Leisure, Streatham High Road - Solar Panels & ASHPApproved, not yet built · 330 kW
Mar 2024
4.8 km away
Road and street works within 1 km
21 permitted works running now or planned, 11 of them major.
- Major, planned
Russell Road, WimbledonDisconnection or alteration of supply · THAMES WATER · Give and take
Oct 2026 to Oct 2026
200 m away - Major
Kirkley Road, WimbledonDisconnection or alteration of supply · THAMES WATER · Give and take
Oct 2026 to Oct 2026
250 m away - Major, planned
Boscombe Road, WimbledonDisconnection or alteration of supply · THAMES WATER · Give and take
Dec 2026 to Jan 2027
300 m away - Major
Cecil Road, WimbledonDisconnection or alteration of supply · THAMES WATER · Give and take
Sept 2026 to Nov 2026
400 m away - Major
Balfour Road, WimbledonDisconnection or alteration of supply · THAMES WATER · Give and take
Sept 2026 to Oct 2026
450 m away - Major
Prince'S Road, WimbledonDisconnection or alteration of supply · THAMES WATER · Give and take
Oct 2026 to Nov 2026
550 m away - Major, planned
Kings Road, WimbledonDisconnection or alteration of supply · THAMES WATER · Give and take
Nov 2026 to Dec 2026
650 m away - Major
Wycliffe Road, WimbledonDisconnection or alteration of supply · THAMES WATER · Give and take
Nov 2026 to Dec 2026
750 m away - Major
Cochrane Road, WimbledonDisconnection or alteration of supply · THAMES WATER · Give and take
Sept 2026 to Oct 2026
750 m away
Major infrastructure projects within 30 km
- Pre-applicationapplication due March 2027
10.7 km away - Decideddecided Sept 2014
12.0 km away - Pre-applicationapplication due March 2028
16.0 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
17.5 km away - Pre-applicationapplication due December 2027
18.7 km away - Decideddecided May 2022
20.3 km away - Pre-application
Transport schemes within 20 km
- Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
8.0 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
8.6 km away - TransportMay 2022
11.2 km away - Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
12.7 km away - Transport
Brent Cross West stationNew Thameslink station, opened December 2023
Dec 2023
17.0 km away
Approved152, DORSET HALL, KINGSTON ROADCreation of two new residential units alongside a scheme of repair and restoration to Dorset Hall with minor extensions to two existing residential flats:Variation of Condition 2 of Planning Permission 25/P3804 to allow for the following amendments:● Removal of four chimney breasts (within flats 3, 4, 5, 8, and 9);● Removal of modern internal walls, doors and cupboards (within flats 1 – 10);●Merton 26/SEC73/1118 · All Other
Jun 2026
400 m away Withdrawn101A, GLADSTONE ROAD, SW19 1QRERECTION OF AN EXTENSION AT FIRST-FLOOR LEVEL, ALTERATIONS TO EXTERNAL DOORS AND WINDOWS, NEW WILDFLOWER SEDUM ROOF, NEW REFUSE AND CYCLE STORE, AND SOLAR PANELS TO MAIN ROOF.Merton 26/HOUSE/0949 · Householder
May 2026
200 m away ApprovedDEVELOPMENT SITE AT 196 TO 200, THE BROADWAYAPPLICATION FOR VARIATION OF CONDITION 2 (APPROVED PLANS), ATTACHED TO LBM PLANNING APPLICATION 20/P1738 RELATING TO THE DEMOLITION OF BUILDINGS AND A 2 PHASED REDEVELOPMENT COMPRISING A MIXED USE DEVELOPMENT WITH THE ERECTION OF PART BASEMENT, PART SINGLE, PART FIVE, PART 6, PART 7, PART 8 AND PART 9 STOREY BUILDINGS. PHASE 1 COMPRISING DEMOLITION OF OLYMPIC HOUSE AND PART OF YMCA AND ERECTIMerton 26/SEC73/0954 · All Other
May 2026
400 m away Running nearest: Beddington EfW (energy from waste, 5.4 km); London’s Queen Elizabeth II reservoir (solar farm, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.