Within 2 km, around Lavender Hill East in Wandsworth. Building, planning, schools, transport, prices and crime.
794new homes completed within 2 km, last 2 years
7,503homes given permission on brownfield sites since 2021
+1.9%like-for-like prices in Lavender Hill East, 2024 → 2025 (council +0.5%)
-13%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
28 new homes completedflats · May 2026 – Sep 2026
Sept 2026 1.6 km away
New homes
5 new homes completedflats · Jul 2026
Jul 2026 1.8 km away
New homes
43 new homes completedflats · Jun 2026
Jun 2026 950 m away
New homes
15 new homes completedflats · Oct 2024 – Jun 2026
Jun 2026 2.0 km away
New homes
73 new homes completedflats · Apr 2026
Apr 2026 1000 m away
New homes
44 new homes completedflats · Feb 2026
Feb 2026 1.0 km away
New homes
9 new homes completedflats · Dec 2025
Dec 2025 1.6 km away
New homes
67 new homes completedflats · Nov 2025
Nov 2025 1.0 km away
New homes
83 new homes completedflats · Jul 2025 – Nov 2025
Nov 2025 1.8 km away
New homes
57 new homes completedflats · Sep 2025
Sept 2025 1000 m away
New homes
7 new homes completedflats · Aug 2025
Sept 2025 1.7 km away
New homes
23 new homes completedflats · Aug 2025
Sept 2025 1.6 km away
New homes
Planning applications within 500 m
94applications in the last 12 months
57approved · 5 refused
29still being decided
34net new homes in approved schemes since 2023
Application Received
185, Eversleigh Road, SW11 5UYAlterations including replacement of single glazed timber sash windows with double glazed timber sash windows.Wandsworth 2026/3120 · All Other
Sept 2026 250 m away
Application Received
88, Elsley Road, SW11 5LLAlterations including erection of a mansard extension to the main rear roof; Erection of an extension above part of the two-storey back addition; Installation of bi-fold doors to the ground floor rear elevation.Wandsworth 2026/3153 · Householder
Sept 2026 150 m away
Application Received
Ground Floor, Lavender Hill, SW11 5TQDisplay of internally illuminated fascia sign.Wandsworth 2026/3109 · All Other
Aug 2026 400 m away
Application Received
128, Eversleigh Road, SW11 5XBInstallation of like-for-like replacement double glazed timber windows to front and rear elevations.Wandsworth 2026/3086 · Householder
Aug 2026 250 m away
Application Received
30, Eversleigh Road, SW11 5XAAlterations including erection of an extension to the main rear roof; Demolition of existing and erection of a new part-single, part-two storey rear extension.Wandsworth 2026/3087 · Householder
Aug 2026 100 m away
Application Received
119, Elsley Road, SW11 5LHAlterations including erection of mansard roof extension to main rear roof and erection of single-storey rear/side extension.Wandsworth 2026/2866 · Householder
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
28hours of spills in 2025 between them (typical neighbourhood: about 36)
New-home postcodes with fewer than 5 homes are counted above but not listed. 66 postcodes nearby had new homes completed in the last two years.
44, Eversleigh Road, SW11 5XA
Installation of replacement timber windows.
Wandsworth 2026/2988 · Householder
Aug 2026 100 m away
Application Received
68, Dorothy Road, SW11 2JPAlterations including erection of a single storey rear and side extension.Wandsworth 2026/2966 · Householder
Aug 2026 350 m away
Application Received
Arch 13a To 13c, Culvert Place, SW11 5BAUse as self storage facility with the siting of 150 containers (224 storage units) (Class B8) for a temporary period of 5 years.Wandsworth 2026/2571 · All Other
Aug 2026 450 m away
Application Received
131, Latchmere Road, SW11 2JYRemoval of condition 6 (Section 278 agreement) of planning permission dated 04/02/2026 ref 2025/4394 (Alterations including demolition of two garages and erection of one new garage and formation of a brick wall to side elevation).Wandsworth 2026/2882 · Householder
Aug 2026 250 m away
Application Received
165, Sabine Road, SW11 5LXAlterations including erection of part single, part two storey rear extension. Erection of mansard roof extension to main rear roof and extension above part of first floor rear extension.Wandsworth 2026/2700 · Householder
Aug 2026 150 m away
Application Received
64, Tyneham Road, SW11 5XPReplacement of four timber sash windows like for like (three to front elevation and 1 to rear top floor elevation)Wandsworth 2026/2817 · Householder
Aug 2026 400 m away
Application Received
41, Eversleigh Road, SW11 5UXAlterations including replacement of single glazed timber sash windows with double glazed timber sash windows.Wandsworth 2026/2793 · All Other
Aug 2026 150 m away
Application Received
9, Poyntz Road, SW11 5BHAlterations including erection of a mansard extension to form an additional floor of accommodation; Demolition of the existing single storey rear extension and erection of a part single, part three storey rear extension; Erection of a new brick boundary wall to the front elevation.Wandsworth 2026/2668 · Householder
Jul 2026 350 m away
Opinion Issued
Telecommunication Station 908 On Roof Top Of 202, Lavender Hill, SW11 1JANotification of intention to install 2 no. 0.3m transmission dishes along with associated ancillary development thereto.Wandsworth 2026/2671 · All Other
Flat First Floor, Marney Road, SW11 5EWAltertions including erection of mansard roof extension to main rear roof and formation of a roof terrace with a 1.7m high glazed screen surround above part of the three-storey back addition in connection with conversion of first and second floor flats into a 3-bed maisonette.Wandsworth 2026/2203 · All Other
Jul 2026 450 m away
Approved
131, Latchmere Road, SW11 2JYDetails of materials pursuant to condition 3 of planning permission dated 08/08/2023 ref 2023/2268 (as varied by 2025/2455) (Variation of condition 2 (in accordance with approved plans) of planning permission dated 08/08/2023 ref 2023/2268 (Alterations including erection of part single/part two storey rear/side extension and excavation to create basement including formation of rear lightwell) to aWandsworth 2026/2476 · All Other
Jul 2026 250 m away
Approved
149, Lavender Hill, SW11 5QJDetermination as to whether prior approval is required for change of use from retail shop (Class E) to residential (Class C3) to provide studio flat.Wandsworth 2026/2468 · Prior Approval · 1 homes proposed
Jul 2026 300 m away
Application Received
Flat Ground Floor, Grayshott Road, SW11 5UDAlterations including erection of single-storey side/rear extension with installation of solar photovoltaic panels to the roof and an air source heat pump within rear garden.Wandsworth 2026/2439 · All Other
Jul 2026 150 m away
Application Received
66, Morrison Street, SW11 5LSAlterations including erection of mansard roof extension to main rear roof and erection of extension above two storey back addition; replacement of existing rear door and window with bifold door at rear ground floor; replacement of windows; stripping paint of front facade and reinstatement original brick work; reinstatement of boundary treatment to front garden wall.Wandsworth 2026/2384 · Householder
Jul 2026 150 m away
Approved
4, Stormont Road, SW11 5ENErection of single storey outbuilding in rear garden.Wandsworth 2026/2380 · All Other
Jul 2026 400 m away
Approved
42, Mysore Road, SW11 5SBAlterations including erection of a mansard extension (with door and safety railing) to the main rear roof; Removal of chimney stacks above the main and back addition roofs; Erection of a single storey rear/side extension.Wandsworth 2026/2313 · Householder
Jul 2026 450 m away
Approved
12, Birley Street, SW11 5XFAlterations including erection of mansard roof extension to main rear roof and erection of a single-storey rear/side extensionWandsworth 2026/2386 · Householder
Jun 2026 350 m away
Approved
13, Ashbury Road, SW11 5UNAlterations including erection of mansard extension to main rear roof; erection of extension above part of two-storey rear addition and erection of single-storey rear/side extension.Wandsworth 2026/2387 · Householder
Jun 2026 300 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
William Booth Training College, Champion Park - Solar PanelsApproved, not yet built
Aug 2023 5.0 km away
Rooftop solar
William Booth Training College, Champion Park - Solar PanelsPlanning application in
Jul 2023 5.0 km away
Running nearest: SELCHP ERF (energy from waste, 8.1 km); Beddington EfW (energy from waste, 9.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Minor
Grayshott Road, LondonUtility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 150 m away
Minor
Eland Road, LondonUtility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 150 m away
Minor
Brassey Square, LondonUtility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 200 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Airports · To the north-west of the existing Heathrow Airport
application due December 2027 20.4 km away
Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport
application due November 2027 22.0 km away
Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.