1new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.6%like-for-like prices in Scholar Green, Rode Heath & Brereton, 2024 → 2025 (council +5.1%)
+17%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New schoolApr 2025
800 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
4homes extended 2021–2025, typically adding 17 m²
13since energy certificates began (2008)
0in ST7 3TQ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
727hours of spills in 2025 between them (typical neighbourhood: about 36)
171spill events counted
- United Utilities
Lawton Gate Wwtwinto Kidsgrove Stream33 spills, 450 hours in 2025
1.4 km away - United Utilities
Lawton Gate Wwtwinto Kidsgrove Stream24 spills, 90 hours in 2025
1.4 km away - United Utilities
Alsager Wwtwinto Tributary Of River Dane19 spills, 76 hours in 2025
1.9 km away - United Utilities
Chestnut Avenue Psinto Trent & Mersey Canal23 spills, 66 hours in 2025
300 m away - United Utilities
Thurlwood No.1 Psinto Trent And Mersey Canal24 spills, 22 hours in 2025
250 m away - United Utilities
113 Hassall Rd Csointo Day Green Stream11 spills, 11 hours in 2025
1.8 km away - United Utilities
Ashemores Lane Lawton Rd Cso 131ceinto Cresswellshawe Brook Via Sws17 spills, 8 hours in 2025
1.5 km away - United Utilities
29 Cresswellshawe Rd B Cso 13567into Cresswellshawe Brk Via Sws8 spills, 3 hours in 2025
1.5 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
24 planned, approved or being built and 5 running (29 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Reynolds Farm, Reynolds Lane - Solar PanelsApproved, not yet built · 200 kW
Mar 2025
4.0 km away - Rooftop solar
Churchill China Uk Limited, Marlborough Way, Sandyford - Solar PanelsApproved, not yet built · 990 kW
Jan 2022
7.3 km away - Rooftop solar
Churchill China Uk Limited, Marlborough Way, Sandyford - Solar PanelsApproved, not yet built · 390 kW
Apr 2022
7.3 km away - Rooftop solar
Marlborough Works, High Street - Solar PanelsApproved, not yet built · 160 kW
Jun 2022
7.3 km away - Rooftop solar
James T Blakeman Services, High Carr Business Park - Solar PanelsApproved, not yet built · 710 kW
Mar 2026
7.8 km away - Rooftop solar
Crewe Hall Hotel, Weston Road - Solar PanelsPlanning application in
Oct 2025
7.9 km away - Solar farm
Middlewich Road - Solar Photovoltaics & Battery StorageApproved, not yet built · 5 MW
Mar 2022
8.1 km away - Battery storage
Middlewich Road - Solar Photovoltaics & Battery StorageApproved, not yet built · 25 MW
Mar 2022
8.1 km away - Rooftop solar
Forfarmers, Speedwell Road- Solar PanelsApproved, not yet built · 330 kW
Jun 2023
8.1 km away - Rooftop solar
Advanced Packaging, Rosevale Road - Solar PanelsApproved, not yet built · 200 kW
Aug 20258.7 km away
Road and street works within 1 km
3 permitted works running now or planned, 3 of them major.
- Major
Brereton Road, Rode HeathHighway improvement works · CHESHIRE EAST COUNCIL · Road closure
Oct 2026 to Oct 2026
650 m away - Major
Street Lane, Rode HeathHighway improvement works · CHESHIRE EAST COUNCIL · Road closure
Oct 2026 to Oct 2026
750 m away - Major
Knutsford Road, Rode HeathHighway improvement works · CHESHIRE EAST COUNCIL · Road closure
Oct 2026 to Oct 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Salinae Hydrogen Storage projectUnderground Gas Storage Facilities · The site is located approximately 5.2km south west of the town of Middlewich, west of Warmingham, in the Cheshire East Council area. It is partly on the site of the existing British Salt/Kistos Energy Storage facility. application due July 2027
10.9 km away - Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire. decided Mar 2017
15.3 km away - Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North. application due April 2027
16.2 km away - Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula application due September 2027
20.1 km away - Decided
Meaford Energy CentreGenerating Stations · Former Meaford Power Station site, east of Meaford Road, to the north of the town of Stone decided Jul 2016
23.0 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Arclid Sand Quarry - Solar Array (rooftop solar, 4.7 km); Land south of Wood Lane (Safeguard Bradwell) (solar farm, 7.5 km); Maw Green Landfill Site (landfill gas, 8.5 km); Maw Green Landfill Site, Cheshire (Extension) (landfill gas, 8.5 km); Noriker Power Staunch (battery storage, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.