Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
11storm overflows within 2 km
641hours of spills in 2025 between them (typical neighbourhood: about 36)
146spill events counted
United Utilities
Lawton Gate Wwtwinto Kidsgrove Stream33 spills, 450 hours in 2025
950 m away
United Utilities
Lawton Gate Wwtwinto Kidsgrove Stream24 spills, 90 hours in 2025
26 planned, approved or being built and 5 running (29 MW between them). Those within 5 km are on the map above.
Rooftop solar
Reynolds Farm, Reynolds Lane - Solar PanelsApproved, not yet built · 200 kW
Mar 2025 5.9 km away
Rooftop solar
Churchill China Uk Limited, Marlborough Way, Sandyford - Solar PanelsApproved, not yet built · 990 kW
Jan 2022 5.9 km away
Rooftop solar
Churchill China Uk Limited, Marlborough Way, Sandyford - Solar PanelsApproved, not yet built · 390 kW
Apr 2022 5.9 km away
Rooftop solar
Marlborough Works, High Street - Solar PanelsApproved, not yet built · 160 kW
Jun 2022 5.9 km away
Rooftop solar
James T Blakeman Services, High Carr Business Park - Solar PanelsApproved, not yet built · 710 kW
Mar 2026 6.0 km away
Rooftop solar
Forfarmers, Speedwell Road- Solar PanelsApproved, not yet built · 330 kW
Jun 2023 6.3 km away
Rooftop solar
Advanced Packaging, Rosevale Road - Solar PanelsApproved, not yet built · 200 kW
Aug 2025 6.8 km away
Rooftop solar
Bradwell Hall Nursing Home, Old Hall Drive - Solar PanelsApproved, not yet built · 240 kW
Jan 2023 7.1 km away
Rooftop solar
Crewe Hall Hotel, Weston Road - Solar PanelsPlanning application in
Oct 2025 7.3 km away
Rooftop solar
Tunstall Trade Park, Brownhills Road - Solar PanelsApproved, not yet built · 230 kW
Feb 20247.5 km away
Road and street works within 1 km
7 permitted works running now or planned, 2 of them major.
Major
Linley Lane, Church LawtonHighway improvement works · CHESHIRE EAST COUNCIL · Road closure
Oct 2026 to Oct 2026 550 m away
Major
Knutsford Road, Church LawtonHighway improvement works · CHESHIRE EAST COUNCIL · Road closure
Oct 2026 to Oct 2026 750 m away
Standard
Moorhouse Avenue, AlsagerHighway repair and maintenance works · CHESHIRE EAST COUNCIL · Multi-way signals
Nov 2026 to Nov 2026 200 m away
Standard
Crewe Road, Church LawtonDisconnection or alteration of supply · MANWEB · Multi-way signals
Oct 2026 to Oct 2026 450 m away
Standard
Wilbrahams Way, AlsagerHighway repair and maintenance works · CHESHIRE EAST COUNCIL · Multi-way signals
Nov 2026 to Nov 2026 500 m away
Standard
Cherry Tree Avenue, Church LawtonUtility repair and maintenance works · MANWEB · Multi-way signals
Oct 2026 to Nov 2026 900 m away
Standard
Station Road, AlsagerHighway repair and maintenance works · CHESHIRE EAST COUNCIL · Road closure
Oct 2026 to Oct 2026 1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Salinae Hydrogen Storage projectUnderground Gas Storage Facilities · The site is located approximately 5.2km south west of the town of Middlewich, west of Warmingham, in the Cheshire East Council area. It is partly on the site of the existing British Salt/Kistos Energy Storage facility.
application due July 2027 11.7 km away
Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire.
decided Mar 2017 16.9 km away
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
application due April 2027 17.9 km away
Decided
Meaford Energy CentreGenerating Stations · Former Meaford Power Station site, east of Meaford Road, to the north of the town of Stone
decided Jul 2016 21.1 km away
Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 21.8 km away
Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Alsager East: +33% over five years (2020 → 2025).
Council tax list: 60 homes added in the neighbourhood since April 2024.
Population (GP registrations): +2.1% in two years.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.