Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
11storm overflows within 2 km
364hours of spills in 2025 between them (typical neighbourhood: about 36)
91spill events counted
Severn Trent Water
Trent Vale Spsinto River Trent31 spills, 287 hours in 2025
850 m away
Severn Trent Water
Clayton Road Spsinto Tributary Of Park Brook6 spills, 29 hours in 2025
800 m away
Severn Trent Water
Michelin A34 Csointo River Trent17 spills, 18 hours in 2025
1.6 km away
Severn Trent Water
Trentham - Stone Road 1 Csointo Longton Brook5 spills, 14 hours in 2025
1.5 km away
Severn Trent Water
Goodwood Place Csointo Longton Brook9 spills, 7 hours in 2025
1.8 km away
Severn Trent Water
Hanford A34 Pumping Stationinto River Trent4 spills, 4 hours in 2025
1.2 km away
Severn Trent Water
Harpfield Road Csointo Lyme Brook8 spills, 3 hours in 2025
1.7 km away
Severn Trent Water
Whitmore Road Csointo River Trent5 spills, 1 hours in 2025
Salinae Hydrogen Storage projectUnderground Gas Storage Facilities · The site is located approximately 5.2km south west of the town of Middlewich, west of Warmingham, in the Cheshire East Council area. It is partly on the site of the existing British Salt/Kistos Energy Storage facility.
application due July 2027 24.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Barlaston, Tittensor & Swynnerton: +30% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.8% in two years.
Leek Road - Solar PV arrayApproved, not yet built · 1 MW
Jan 2022 6.4 km away
Rooftop solar
Arnold Clark Automobiles Limited, Brymbo Road - Solar PanelsApproved, not yet built · 290 kW
Mar 2026 6.5 km away
Running nearest: Stoke-on-Trent EfW (energy from waste, 2.7 km); Screwfix Direct (rooftop solar, 2.9 km); Keele University (solar farm, 3.8 km); Keele University (battery storage, 3.8 km); The Low Carbon Energy Generation Project at Keele University (wind farm, 4.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.