What's changing near ST5 3RY
Within 2 km, around Clayton & Langdale in Newcastle-under-Lyme. Building, planning, schools, transport, prices and crime.
135new homes completed within 2 km, last 2 years
196homes given permission on brownfield sites since 2021
+2.4%like-for-like prices in Clayton & Langdale, 2024 → 2025 (council +3.2%)
+11%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
41 new homes completed2 flats, 39 houses · Sep 2025 – Sep 2026
Sept 2026
1.1 km away - New homes
36 new homes completedhouses · Nov 2024 – Sep 2026
Sept 2026
1.2 km away - School closed
School closed: Edenhurst Preparatory SchoolOther independent school, other independent school (closure)
Aug 2026
900 m away - New homes
8 new homes completed7 flats, 1 houses · Jun 2025 – Aug 2025
Aug 2025
1.5 km away - New homes
15 new homes completedhouses · Oct 2024 – Jun 2025
Jun 2025
1.9 km away - New homes
12 new homes completedflats · Apr 2025
Apr 2025
1.1 km away - New homes
6 new homes completedhouses · Nov 2024 – Mar 2025
Mar 2025
1.6 km away - New homes
7 new homes completedhouses · Nov 2024 – Dec 2024
Dec 2024
1.7 km away - Planning permissionMay 2023
1.4 km away - Planning permission
Permission for 60 homesLand at Former St. Peters High School, Queen''s Road, Hartshill, Stoke-on-Trent, ST4 7LH (full planning permission) Jun 2022
1.9 km away
15homes extended 2021–2025, typically adding 29 m²
41since energy certificates began (2008)
0in ST5 3RY itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
15storm overflows within 2 km
140hours of spills in 2025 between them (typical neighbourhood: about 36)
161spill events counted
- Severn Trent Water
Hartshill - Riseley Road Csointo Tributary Of Lyme Brook31 spills, 42 hours in 2025
1.4 km away - Severn Trent Water
Clayton Road Csointo Lyme Brook23 spills, 34 hours in 2025
700 m away - Severn Trent Water
Stafford Avenue Csointo Lyme Brook11 spills, 24 hours in 2025
1.1 km away - Severn Trent Water
Hilton Road Combined Sewer Overflowinto Lyme Brook28 spills, 20 hours in 2025
1.1 km away - Severn Trent Water
King Street Csointo Tributary Of Lyme Brook19 spills, 8 hours in 2025
1.5 km away - Severn Trent Water
Dartmouth Avenue Csointo Tributary Of Lyme Brook12 spills, 3 hours in 2025
750 m away - Severn Trent Water
Harpfield Road Csointo Lyme Brook8 spills, 3 hours in 2025
1.7 km away - Severn Trent Water
Pilkington Avenue Csointo Trib Of Lyme Brook8 spills, 3 hours in 2025
900 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
37 planned, approved or being built and 6 running (43 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Royal Stoke University Hospital - Solar PanelsApproved, not yet built · 1 MW
Sept 2025
1.2 km away - Rooftop solar
Manor Bakeries, Newcastle Road - Solar Photovoltaics PanelsApproved, not yet built · 160 kW
Dec 2023
1.3 km away - Rooftop solar
Manor Bakeries, Newcastle Road - Solar PanelsApproved, not yet built · 610 kW
Nov 2024
1.3 km away - Rooftop solar
Thistley Hough Academy, Thistley Hough - Solar PanelsApproved, not yet built · 410 kW
Dec 2025
1.8 km away - Rooftop solar
Workshop, Croft Road - Solar PanelsApproved, not yet built · 180 kW
Apr 2025
2.0 km away - Battery storage
Coaldale Road & Ore Close, Lymedale Business Park - Micro Energy StorageApproved, not yet built · 200 kW
Mar 2026
3.3 km away - Rooftop solar
Tree Of Life, Coaldale Road - Solar PanelsApproved, not yet built · 500 kW
May 2023
3.4 km away - Rooftop solar
Arnold Clark Automobiles Limited, Brymbo Road - Solar PanelsApproved, not yet built · 290 kW
Mar 2026
3.4 km away - Rooftop solar
Arnold Clark Automobiles - Solar PanelsApproved, not yet built · 240 kW
Feb 2026
3.6 km away - Rooftop solar
The 4 Candles, High Street - Solar PanelApproved, not yet built
Jun 20233.7 km away
Road and street works within 1 km
17 permitted works running now or planned, 6 of them major.
- Major, planned
Link Footway From Kentmere Place To Clay, Newcastle Under LymeUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Nov 2026 to Dec 2026
350 m away - Major
Link Footway From Kentmere Place To Clay, Newcastle Under LymeUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026
350 m away - Major, planned
Emery Avenue, Newcastle Under LymeNew service connection · SEVERN TRENT WATER · Road closure
Dec 2026 to Dec 2026
750 m away - Major
Emery Avenue, Newcastle Under LymeNew service connection · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026
750 m away - Major
Friarswood Road, Newcastle Under LymeUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Nov 2026 to Nov 2026
850 m away - Major
Friarswood Road, Newcastle Under LymeUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026
950 m away - Minor
Edward Avenue, Newcastle Under LymeHighway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
50 m away - Minor
Norwich Place, Newcastle Under LymeHighway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
700 m away - Minor
Deakin Grove, Newcastle Under LymeHighway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Some carriageway incursion
Major infrastructure projects within 30 km
- Decided
Meaford Energy CentreGenerating Stations · Former Meaford Power Station site, east of Meaford Road, to the north of the town of Stone decided Jul 2016
9.4 km away - Decideddecided Mar 2014
14.7 km away - Pre-application
Salinae Hydrogen Storage projectUnderground Gas Storage Facilities · The site is located approximately 5.2km south west of the town of Middlewich, west of Warmingham, in the Cheshire East Council area. It is partly on the site of the existing British Salt/Kistos Energy Storage facility. application due July 2027
22.0 km away - Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire. decided Mar 2017
28.6 km away - Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North. application due April 2027
29.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Keele University (solar farm, 2.0 km); Keele University (battery storage, 2.0 km); The Low Carbon Energy Generation Project at Keele University (wind farm, 2.8 km); Stoke-on-Trent EfW (energy from waste, 3.3 km); Noriker Power Staunch (battery storage, 3.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.