Country England and Wales › Region West Midlands › Council Stafford › Neighbourhood Barlaston, Tittensor & Swynnerton › Postcode ST12 9HP What's changing near ST12 9HP Within 2 km, around Barlaston, Tittensor & Swynnerton in Stafford. Building, planning, schools, transport, prices and crime.
1 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+9.4% like-for-like prices in Barlaston, Tittensor & Swynnerton, 2024 → 2025 (council +2.6%)
+15% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
1 homes extended 2021–2025, typically adding 70 m²
2 since energy certificates began (2008)
2 in ST12 9HP itself
Extended certificate 2024 Extended certificate 2014 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 4 storm overflows within 2 km
786 hours of spills in 2025 between them (typical neighbourhood: about 36)
154 spill events counted
Severn Trent Water Strongford Sewage Treatment Works into Yockerton Brook 57 spills, 521 hours in 2025
1.2 km away Severn Trent Water Barlaston - Barlaston Sso into River Trent 43 spills, 223 hours in 2025
1.3 km away Severn Trent Water Tittensor Combined Sewer Overflow into River Trent 27 spills, 35 hours in 2025
1.0 km away Severn Trent Water Barlaston Old Road Cso into Tributary Of River Trent 27 spills, 7 hours in 2025
1.5 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 26 planned, approved or being built and 7 running (27 MW between them). Those within 5 km are on the map above.
Battery storage Barlaston - Battery Energy Storage System Approved, not yet built
Oct 2022 2.5 km away Solar farm Newcastle Road, Cotes Heath - Solar Panels Planning application in · 15 MW
Jul 2025 4.9 km away Rooftop solar Manor Bakeries, Newcastle Road - Solar Panels Approved, not yet built · 610 kW
Nov 2024 5.8 km away Rooftop solar Manor Bakeries, Newcastle Road - Solar Photovoltaics Panels Approved, not yet built · 160 kW
Dec 2023 5.8 km away Rooftop solar Thistley Hough Academy, Thistley Hough - Solar Panels Approved, not yet built · 410 kW
Dec 2025 6.1 km away Rooftop solar Royal Stoke University Hospital - Solar Panels Approved, not yet built · 1 MW
Sept 2025 6.6 km away Rooftop solar Ormiston Meridian Academy, Sandon Road - Solar Panels Approved, not yet built · 160 kW
Mar 2026 7.0 km away Battery storage Aspley House Farm, Aspley Lane - Battery Storage Facility Approved, not yet built · 10 MW
Jan 2023 7.3 km away Battery storage Brooms Road - Micro Energy Storage Approved, not yet built · 200 kW
Mar 2026 7.5 km away Rooftop solar VWS, Meir - Solar Panels Approved, not yet built · 370 kW
Mar 2025 7.6 km away Road and street works within 1 km 3 permitted works running now or planned.
Standard Stone Road, Tittensor Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Lane closure
Jul 2027 to Jul 2027 700 m away Standard Stone Road, Tittensor Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Lane closure
Sept 2027 to Sept 2027 700 m away Standard Stone Road, Tittensor Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Lane closure
Apr 2027 to Apr 2027 750 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Meaford Energy Centre Generating Stations · Former Meaford Power Station site, east of Meaford Road, to the north of the town of Stone decided Jul 2016 3.2 km away Decided decided Mar 2014 8.3 km away Pre-application Salinae Hydrogen Storage project Underground Gas Storage Facilities · The site is located approximately 5.2km south west of the town of Middlewich, west of Warmingham, in the Cheshire East Council area. It is partly on the site of the existing British Salt/Kistos Energy Storage facility. application due July 2027 28.0 km away Decided decided May 2020 29.3 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Screwfix Direct (rooftop solar, 4.0 km); Meece Landfill (landfill gas, 4.8 km); Stoke-on-Trent EfW (energy from waste, 5.1 km); Keele University (solar farm, 7.0 km); Keele University (battery storage, 7.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.