Country England and Wales › Region West Midlands › Council Staffordshire Moorlands › Neighbourhood Blythe Bridge, Forsbrook & Caverswall › Postcode ST11 9EQ What's changing near ST11 9EQ Within 2 km, around Blythe Bridge, Forsbrook & Caverswall in Staffordshire Moorlands. Building, planning, schools, transport, prices and crime.
59 new homes completed within 2 km, last 2 years
79 homes given permission on brownfield sites since 2021
-2.5% like-for-like prices in Blythe Bridge, Forsbrook & Caverswall, 2024 → 2025 (council +2.7%)
+15% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 9 new homes completed houses · Jun 2025 – Jul 2026
Jul 2026 1.3 km away New homes 18 new homes completed houses · Nov 2025 – Jun 2026
Jun 2026 1.4 km away New homes 12 new homes completed houses · Jun 2025 – Nov 2025
Nov 2025 1.2 km away New homes 5 new homes completed houses · Dec 2024
Jan 2025 900 m away New homes 8 new homes completed houses · Nov 2024 – Dec 2024
Dec 2024 1000 m away New homes 6 new homes completed houses · Nov 2024
Dec 2024 1.0 km away New school New school: St Peter's Church of England Primary School Academy sponsor led, primary
Dec 2024 350 m away New school Sept 2024 1.4 km away Planning permission May 2024 1.2 km away New school Feb 2023 2.0 km away Planning permission New-home postcodes with fewer than 5 homes are counted above but not listed. 7 postcodes nearby had new homes completed in the last two years.
0 homes extended 2021–2025
2 since energy certificates began (2008)
0 in ST11 9EQ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
16 hours of spills in 2025 between them (typical neighbourhood: about 36)
7 spill events counted
Severn Trent Water Meir - Meir Road (Cso) into Trib Of River Blythe 7 spills, 16 hours in 2025
1.4 km away Severn Trent Water Weston Coyney - Park Ave/Horton Drive (Cso) into Anchor Brook 0 spills, 0 hours in 2025
2.0 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 36 planned, approved or being built and 4 running (37 MW between them). Those within 5 km are on the map above.
Rooftop solar Unit 2, G-park, Whittle Road - Solar Panels Approved, not yet built · 840 kW
Aug 2022 2.1 km away Rooftop solar VWS, Meir - Solar Panels Approved, not yet built · 370 kW
Mar 2025 2.1 km away Rooftop solar Ormiston Meridian Academy, Sandon Road - Solar Panels Approved, not yet built · 160 kW
Mar 2026 2.4 km away Battery storage Cromartie Hobbycraft, From Park Hall Road - Micro Energy Storage Planning application in · 200 kW
Feb 2026 2.5 km away Rooftop solar Mossfield Road - Solar PV Generation System Approved, not yet built · 370 kW
Jan 2022 3.6 km away Battery storage Leek Road, Werrington - Battery Energy Storage Planning application in · 300 MW
Aug 2025 4.0 km away Solar farm Leaford Solar Farm, Fulford Lane - Solar Farm Planning application in · 30 MW
Jun 2024 4.3 km away Battery storage Draycott Cross Road - Battery Storage System Approved, not yet built · 40 MW
Jan 2024 4.9 km away Battery storage Armshead Farm, Armshead Road - Battery Energy Storage Facility Approved, not yet built · 50 MW
Sept 2024 5.0 km away Battery storage Cellarhead Substation, Rownall Road - Battery Storage Facility Planning application in · 400 MW
Feb 2024 5.4 km away Road and street works within 1 km 2 permitted works running now or planned, 1 of them major.
Major, planned The Hollow, Caverswall Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026 750 m away Minor School Lane, Caverswall Utility repair and maintenance works · BT · No carriageway incursion
Oct 2026 to Oct 2026 200 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Meaford Energy Centre Generating Stations · Former Meaford Power Station site, east of Meaford Road, to the north of the town of Stone decided Jul 2016 9.0 km away Decided decided Mar 2014 15.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Land at Heywood Grange (solar farm, 1.7 km); Lower Newton Farm (solar farm, 6.1 km); Screwfix Direct (rooftop solar, 6.1 km); Stoke-on-Trent EfW (energy from waste, 6.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.