What's changing near ST10 4QW
Within 2 km, around Cheadle South & Upper Tean in Staffordshire Moorlands. Building, planning, schools, transport, prices and crime.
3new homes completed within 2 km, last 2 years
48homes given permission on brownfield sites since 2021
+0.9%like-for-like prices in Cheadle South & Upper Tean, 2024 → 2025 (council +2.7%)
-16%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- Planning permissionDec 2022
1.1 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 2 postcodes nearby had new homes completed in the last two years.
1homes extended 2021–2025, typically adding 30 m²
3since energy certificates began (2008)
1in ST10 4QW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
220hours of spills in 2025 between them (typical neighbourhood: about 36)
42spill events counted
- Severn Trent Water
Checkley Sewage Treatment Worksinto River Tean35 spills, 199 hours in 2025
300 m away - Severn Trent Water
Checkley Sewage Pumping Stationinto River Tean7 spills, 21 hours in 2025
550 m away - Severn Trent Water
Checkley - Badgers Hollow Sps (Cso) into River Tean0 spills, 0 hours in 2025
1000 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
13 planned, approved or being built and 5 running (36 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Goldhurst Distributions, Hollington Road - Solar PanelsApproved, not yet built · 150 kW
May 2026
1.7 km away - Battery storage
Tean Leys Farm, Tean Leys - Battery StoragePlanning application in · 70 MW
May 2025
2.4 km away - Solar farm
Upper Leigh Solar FarmApproved, not yet built · 50 MW
Apr 2024
2.7 km away - Battery storage
Upper Leigh - Battery Energy Storage SystemPlanning application in · 20 MW
Jul 2025
3.5 km away - Solar farm
Totmonslow Farm, Upper Tean - Solar FarmApproved, not yet built · 20 MW
Aug 2023
4.5 km away - Solar farm
Blythe House Farm Extension - Solar ArrayApproved, not yet built · 17 MW
Jul 2024
4.6 km away - Solar farm
Upper Newton Farm (Blythe House) - Solar Farm & Battery StorageApproved, not yet built · 28 MW
Feb 2023
4.8 km away - Battery storage
Upper Newton Farm (Blythe House) - Solar Farm & Battery StorageApproved, not yet built · 30 MW
Feb 2023
4.8 km away - Battery storage
Draycott Cross Road - Battery Storage SystemApproved, not yet built · 40 MW
Jan 2024
6.1 km away - Rooftop solar
Uttoxeter Leisure Centre, Oldfields Road - Solar PV PanelsApproved, not yet built · 250 kW
Jul 2025
7.0 km away
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
- Major, planned
Church Lane, CheckleyNew service connection · SEVERN TRENT WATER · Road closure
Nov 2026 to Nov 2026
600 m away - Major
Church Lane, CheckleyNew service connection · SEVERN TRENT WATER · Road closure
Nov 2026 to Nov 2026
600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Meaford Energy CentreGenerating Stations · Former Meaford Power Station site, east of Meaford Road, to the north of the town of Stone decided Jul 2016
14.4 km away - Decideddecided Mar 2014
17.7 km away - Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne. application due June 2027
28.2 km away - Decideddecided Jun 2025
28.7 km away - Decideddecided Dec 2014
28.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lower Newton Farm (solar farm, 4.8 km); Woodhouse Fields Farm (solar farm, 5.6 km); Moneystone Quarry Solar Farm (solar farm, 8.6 km); Solar farm at land at The Willows, Uttoxeter (solar farm, 8.7 km); Land at Heywood Grange (solar farm, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.