Country England and Wales › Region West Midlands › Council Staffordshire Moorlands › Neighbourhood Cheadle South & Upper Tean › Postcode ST10 4JS What's changing near ST10 4JS Within 2 km, around Cheadle South & Upper Tean in Staffordshire Moorlands. Building, planning, schools, transport, prices and crime.
62 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.9% like-for-like prices in Cheadle South & Upper Tean, 2024 → 2025 (council +2.7%)
-16% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 16 new homes completed houses · Dec 2024 – Oct 2026
planned Oct 2026 1.1 km away New homes 10 new homes completed 1 flats, 9 houses · Oct 2025 – Aug 2026
Aug 2026 1.3 km away New homes 9 new homes completed 1 flats, 8 houses · Oct 2025 – Aug 2026
Aug 2026 1.3 km away New homes 13 new homes completed houses · Jan 2025 – Apr 2026
Apr 2026 1.2 km away New homes 6 new homes completed houses · Oct 2025 – Nov 2025
Nov 2025 1.3 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
1 homes extended 2021–2025, typically adding 59 m²
5 since energy certificates began (2008)
0 in ST10 4JS itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
15 hours of spills in 2025 between them (typical neighbourhood: about 36)
13 spill events counted
Severn Trent Water Cross Keys Storm Cso into River Tean 13 spills, 15 hours in 2025
850 m away Severn Trent Water Checkley - Badgers Hollow Sps (Cso) into River Tean 0 spills, 0 hours in 2025
1.7 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 18 planned, approved or being built and 4 running (30 MW between them). Those within 5 km are on the map above.
Battery storage Tean Leys Farm, Tean Leys - Battery Storage Planning application in · 70 MW
May 2025 1.3 km away Rooftop solar Goldhurst Distributions, Hollington Road - Solar Panels Approved, not yet built · 150 kW
May 2026 1.5 km away Solar farm Upper Leigh Solar Farm Approved, not yet built · 50 MW
Apr 2024 1.7 km away Solar farm Totmonslow Farm, Upper Tean - Solar Farm Approved, not yet built · 20 MW
Aug 2023 2.1 km away Solar farm Blythe House Farm Extension - Solar Array Approved, not yet built · 17 MW
Jul 2024 2.6 km away Solar farm Upper Newton Farm (Blythe House) - Solar Farm & Battery Storage Approved, not yet built · 28 MW
Feb 2023 2.8 km away Battery storage Upper Newton Farm (Blythe House) - Solar Farm & Battery Storage Approved, not yet built · 30 MW
Feb 2023 2.8 km away Battery storage Upper Leigh - Battery Energy Storage System Planning application in · 20 MW
Jul 2025 3.3 km away Battery storage Draycott Cross Road - Battery Storage System Approved, not yet built · 40 MW
Jan 2024 3.7 km away Solar farm New Buildings Solar Farm, Sandon Road - Solar Farm Planning application in · 40 MW
Sept 2025 5.6 km away Road and street works within 1 km 13 permitted works running now or planned, 1 of them major.
Major Gorsty Hill Road, Upper Tean Utility repair and maintenance works · SEVERN TRENT WATER · Road closure
Nov 2026 to Nov 2026 750 m away Standard Uttoxeter Road, Lower Tean Utility repair and maintenance works · National Grid Electricity Distribution (West Midlands) · Two-way signals
Nov 2026 to Nov 2026 900 m away Minor Uttoxeter Road, Upper Tean Utility repair and maintenance works · BT · Two-way signals
Nov 2026 to Nov 2026 350 m away Minor Uttoxeter Road, Upper Tean Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Two-way signals
Dec 2026 to Dec 2026 350 m away Minor Uttoxeter Road, Upper Tean Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Two-way signals
Nov 2026 to Nov 2026 400 m away Minor Uttoxeter Road, Upper Tean Utility asset works · BT · Two-way signals
Oct 2026 to Oct 2026 450 m away Minor Aintree Road, Upper Tean Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Some carriageway incursion
Dec 2026 to Dec 2026 550 m away Minor Ashleigh Road, Upper Tean Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Some carriageway incursion
Dec 2026 to Dec 2026 650 m away Minor Uttoxeter Road, Lower Tean Utility asset works · BT · Multi-way signals
Oct 2026 to Oct 2026 650 m away Minor Major infrastructure projects within 30 km Decided Meaford Energy Centre Generating Stations · Former Meaford Power Station site, east of Meaford Road, to the north of the town of Stone decided Jul 2016 12.8 km away Decided decided Mar 2014 16.9 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lower Newton Farm (solar farm, 2.8 km); Woodhouse Fields Farm (solar farm, 7.3 km); Land at Heywood Grange (solar farm, 7.5 km); Moneystone Quarry Solar Farm (solar farm, 7.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.