Country England and Wales › Region West Midlands › Council Staffordshire Moorlands › Neighbourhood Cheadle North, Alton & Kingsley › Postcode ST10 2BA What's changing near ST10 2BA Within 2 km, around Cheadle North, Alton & Kingsley in Staffordshire Moorlands. Building, planning, schools, transport, prices and crime.
2 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.1% like-for-like prices in Cheadle North, Alton & Kingsley, 2024 → 2025 (council +2.7%)
-14% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
1 homes extended 2021–2025, typically adding 48 m²
2 since energy certificates began (2008)
0 in ST10 2BA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 3 storm overflows within 2 km
1,646 hours of spills in 2025 between them (typical neighbourhood: about 36)
170 spill events counted
Severn Trent Water Froghall Sewage Treatment Works into River Churnet 74 spills, 1,252 hours in 2025
1.2 km away Severn Trent Water Froghall Sewage Treatment Works into River Churnet 66 spills, 212 hours in 2025
1.2 km away Severn Trent Water Kingsley Holt Pumping Station into Mobberley Brook 30 spills, 182 hours in 2025
800 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 23 planned, approved or being built and 3 running (25 MW between them). Those within 5 km are on the map above.
Solar farm Consall Hall Gardens - Solar Photovoltaic Array Approved, not yet built · 300 kW
Apr 2025 3.2 km away Battery storage Draycott Cross Road - Battery Storage System Approved, not yet built · 40 MW
Jan 2024 4.8 km away Battery storage Leek Road, Werrington - Battery Energy Storage Planning application in · 300 MW
Aug 2025 5.8 km away Rooftop solar F Ball & Company Limited, Station Road - Solar panels Approved, not yet built · 390 kW
Dec 2023 6.7 km away Battery storage Cellarhead Substation, Rownall Road - Battery Storage Facility Planning application in · 400 MW
Feb 2024 7.0 km away Battery storage Cellarhead Substation, Rownall Road - Battery Energy Facility Approved, not yet built · 400 MW
Dec 2022 7.1 km away Battery storage Cellarhead Substation, Rownall Road - Battery Storage Planning application in · 3 MW
Oct 2022 7.1 km away Solar farm Totmonslow Farm, Upper Tean - Solar Farm Approved, not yet built · 20 MW
Aug 2023 7.2 km away Battery storage Newfields Farm, Rownall Road - Battery Energy Storage Approved, not yet built · 100 MW
Jul 2025 7.2 km away Rooftop solar Goldhurst Distributions, Hollington Road - Solar Panels Approved, not yet built · 150 kW
May 2026 7.5 km away Road and street works within 1 km 10 permitted works running now or planned.
Standard Holt Lane, Kingsley Utility asset works · BT · Two-way signals
Nov 2026 to Nov 2026 450 m away Standard Shawe Park Road, Kingsley Holt Utility asset works · BT · Two-way signals
Nov 2026 to Nov 2026 800 m away Minor High Street, Kingsley Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Stop/go boards
Jan 2027 to Jan 2027 350 m away Minor Dovedale Road, Kingsley Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Two-way signals
Jan 2027 to Jan 2027 400 m away Minor Johnson Crescent, Kingsley Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Some carriageway incursion
Dec 2026 to Dec 2026 450 m away Minor Hazles Cross Road, Kingsley Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Stop/go boards
Jan 2027 to Jan 2027 550 m away Immediate - urgent Kingsley Bank, Froghall Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Two-way signals
Nov 2025 to Nov 2026 700 m away Minor The Stakes, Froghall Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Two-way signals
Jan 2027 to Jan 2027 750 m away Minor Shawe Park Road, Kingsley Holt Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Two-way signals
Jan 2027 to Jan 2027 800 m away Minor Churnet Valley Road, Kingsley Holt
Major infrastructure projects within 30 km Decided Meaford Energy Centre Generating Stations · Former Meaford Power Station site, east of Meaford Road, to the north of the town of Stone decided Jul 2016 16.1 km away Decided decided Mar 2014 21.7 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Moneystone Quarry Solar Farm (solar farm, 3.2 km); Land at Heywood Grange (solar farm, 5.8 km); Lower Newton Farm (solar farm, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.