Country England and Wales › Region West Midlands › Council Staffordshire Moorlands › Neighbourhood Cheadle Town › Postcode ST10 1HB What's changing near ST10 1HB Within 2 km, around Cheadle Town in Staffordshire Moorlands. Building, planning, schools, transport, prices and crime.
14 new homes completed within 2 km, last 2 years
8 homes given permission on brownfield sites since 2021
+6.2% like-for-like prices in Cheadle Town, 2024 → 2025 (council +2.7%)
+31% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 3 postcodes nearby had new homes completed in the last two years.
13 homes extended 2021–2025, typically adding 24 m²
20 since energy certificates began (2008)
0 in ST10 1HB itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 4 storm overflows within 2 km
250 hours of spills in 2025 between them (typical neighbourhood: about 36)
116 spill events counted
Severn Trent Water Brookhouses Cso into River Tean 23 spills, 97 hours in 2025
1.6 km away Severn Trent Water Tean Road Wtw Cso into Cecilly Brook 43 spills, 79 hours in 2025
1.2 km away Severn Trent Water Queen Street Cso into Cecilly Brook 49 spills, 73 hours in 2025
300 m away Severn Trent Water Cheadle - Bedbrook Farm (Sso) into River Perry 1 spills, 0 hours in 2025
800 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 27 planned, approved or being built and 4 running (30 MW between them). Those within 5 km are on the map above.
Battery storage Draycott Cross Road - Battery Storage System Approved, not yet built · 40 MW
Jan 2024 2.1 km away Solar farm Totmonslow Farm, Upper Tean - Solar Farm Approved, not yet built · 20 MW
Aug 2023 4.0 km away Rooftop solar Goldhurst Distributions, Hollington Road - Solar Panels Approved, not yet built · 150 kW
May 2026 4.3 km away Solar farm Blythe House Farm Extension - Solar Array Approved, not yet built · 17 MW
Jul 2024 4.9 km away Solar farm Upper Newton Farm (Blythe House) - Solar Farm & Battery Storage Approved, not yet built · 28 MW
Feb 2023 5.1 km away Battery storage Upper Newton Farm (Blythe House) - Solar Farm & Battery Storage Approved, not yet built · 30 MW
Feb 2023 5.1 km away Battery storage Tean Leys Farm, Tean Leys - Battery Storage Planning application in · 70 MW
May 2025 5.2 km away Solar farm Upper Leigh Solar Farm Approved, not yet built · 50 MW
Apr 2024 5.5 km away Solar farm Consall Hall Gardens - Solar Photovoltaic Array Approved, not yet built · 300 kW
Apr 2025 5.8 km away Battery storage Leek Road, Werrington - Battery Energy Storage Planning application in · 300 MW
Aug 2025 6.9 km away Road and street works within 1 km 13 permitted works running now or planned, 6 of them major.
Major, planned High Street, Cheadle Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 300 m away Major, planned The Birches, Cheadle Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 700 m away Major The Birches, Cheadle Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 700 m away Major Glebe Road, Cheadle Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 750 m away Major, planned Attlee Road, Cheadle Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 800 m away Major Attlee Road, Cheadle Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 800 m away Standard High Street, Cheadle Utility asset works · BT · Some carriageway incursion
Dec 2026 to Dec 2026 500 m away Standard Froghall Road, Cheadle Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Two-way signals
Feb 2027 to Feb 2027 700 m away Minor Robina Drive, Cheadle Highway improvement works · STAFFORDSHIRE COUNTY COUNCIL · Some carriageway incursion
Nov 2026 to Nov 2026 150 m away Minor Major infrastructure projects within 30 km Decided Meaford Energy Centre Generating Stations · Former Meaford Power Station site, east of Meaford Road, to the north of the town of Stone decided Jul 2016 14.0 km away Decided decided Mar 2014 19.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Moneystone Quarry Solar Farm (solar farm, 4.4 km); Lower Newton Farm (solar farm, 5.1 km); Land at Heywood Grange (solar farm, 5.2 km); Woodhouse Fields Farm (solar farm, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.