Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
11storm overflows within 2 km
292hours of spills in 2025 between them (typical neighbourhood: about 36)
133spill events counted
Northumbrian Water
Horden Dene Pumping Stationinto North Sea55 spills, 181 hours in 2025
1.7 km away
Northumbrian Water
Paradise Farm Csointo Horden Burn32 spills, 71 hours in 2025
850 m away
Northumbrian Water
Station Road Csointo Horden Burn17 spills, 17 hours in 2025
1.1 km away
Northumbrian Water
Blackhills Farm Csointo Blackhills Gill6 spills, 11 hours in 2025
1.4 km away
Northumbrian Water
Horden Dene Sso No 1into Horden Burn/Thorpe Burn14 spills, 10 hours in 2025
1.6 km away
Northumbrian Water
South East View Csointo Blackhills Gill4 spills, 1 hours in 2025
1.4 km away
Northumbrian Water
Sunderland Road Csointo Horden Burn5 spills, 1 hours in 2025
1.1 km away
Northumbrian Water
High Reflief Overflowinto North Sea0 spills, 0 hours in 2025
Carrs Farm, South Hetton - Battery Energy Storage SystemPlanning application in · 200 MW
May 2025 5.1 km away
Solar farm
Fox Cover Solar Farm - Ground Mounted Photovoltaic PanelsApproved, not yet built · 8 MW
Mar 2025 5.2 km away
Road and street works within 1 km
14 permitted works running now or planned, 8 of them major.
Major, planned
Conyers Crescent, HordenUtility repair and maintenance works · NORTHERN GAS NETWORKS · Give and take
Jan 2027 to Feb 2027 200 m away
Major, planned
Webb Square, HordenUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Jan 2027 to Feb 2027 300 m away
Major, planned
Thorpe Road, HordenUtility repair and maintenance works · NORTHERN GAS NETWORKS · Two-way signals
Jan 2027 to Feb 2027 350 m away
Major, planned
Sunderland Road, HordenUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Jan 2027 to Mar 2027 450 m away
Major, planned
Parsons Road, PeterleeUtility repair and maintenance works · NORTHERN GAS NETWORKS · Give and take
Jan 2027 to Feb 2027 550 m away
Major, planned
Sunderland Avenue, HordenNew service connection · NORTHERN GAS NETWORKS · Road closure
Oct 2026 to Oct 2026 600 m away
Major
Sunderland Avenue, HordenNew service connection · NORTHERN GAS NETWORKS · Road closure
Oct 2026 to Oct 2026 600 m away
Major, planned
Faraday Road, PeterleeUtility repair and maintenance works · NORTHERN GAS NETWORKS · Give and take
Dec 2026 to Dec 2026 600 m away
Minor
Parsons Road, PeterleeHighway repair and maintenance works · DURHAM COUNTY COUNCIL · Stop/go boards
Oct 2026 to Oct 2026800 m away
Major infrastructure projects within 30 km
Pre-application
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.