Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
293hours of spills in 2025 between them (typical neighbourhood: about 36)
72spill events counted
Northumbrian Water
Coop House Wood Csointo Coop House Dene Burn · near bathing water: Seaham Beach36 spills, 162 hours in 2025
1.6 km away
Northumbrian Water
Dalton Retail Park Csointo Dalton Burn12 spills, 122 hours in 2025
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
Seaham Solar Park, Stockton Road - Solar FarmPlanning application in · 48 MW
Feb 2025 4.8 km away
Solar farm
Hackworth Road, North West Industrial Estate - Solar PanelsPlanning application in · 15 MW
Jul 2025 4.9 km away
Running nearest: Hawthorn Grid Site - Battery Storage (battery storage, 1.6 km); Great Eppleton Wind Farm (wind farm, 2.9 km); Great Eppleton Farm Repowering (wind farm, 2.9 km); South Sharpley Wind Farm (Revised) (wind farm, 3.0 km); High Haswell Wind Farm (wind farm, 4.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
The Net Zero Teesside ProjectGenerating Stations · Land at and in the vicinity of Teesworks, Redcar, Teesside, TS10 5QW
decided Feb 2024 27.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.