Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
312hours of spills in 2025 between them (typical neighbourhood: about 36)
97spill events counted
Northumbrian Water
Dalton-Le-Dale Csointo Dawdon Dene Beck · near bathing water: Seaham Hall Beach45 spills, 183 hours in 2025
750 m away
Northumbrian Water
Mill Inn A Ssointo Seaton Burn · near bathing water: Seaham Hall Beach11 spills, 108 hours in 2025
1.2 km away
Northumbrian Water
Cso At Warkworth Crescentinto Scawpie Dean10 spills, 14 hours in 2025
H2NorthEast (H2NE)Other Pipe-lines · The project is to be located on Seal Sands, within the administrative boundary of Stockton Borough Council and Redcar and Cleveland Borough Council. The proposed hydrogen distribution pipeline will link from the Hydrogen Production Facility to Cowpen Bewley to the west (approximately 7km in length) and Wilton to the east (approximately 10km in length). The total length of the three customer spur pipelines is around 2.6km.
Venerable Bede Church Of England Academy - Solar PanelsApproved, not yet built · 320 kW
Oct 2025 5.1 km away
Rooftop solar
Sunderland City Council Independent Living Centre - Solar PanelsPlanning application in · 220 kW
Sept 2024 5.3 km away
Running nearest: High Sharpley Wind Farm (wind farm, 1.2 km); South Sharpley Wind Farm (Revised) (wind farm, 3.3 km); Hawthorn Grid Site - Battery Storage (battery storage, 4.5 km); Great Eppleton Wind Farm (wind farm, 4.9 km); Great Eppleton Farm Repowering (wind farm, 4.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Standard
Bethune Avenue, SeahamNew service connection · NORTHERN POWERGRID (NORTHEAST) PLC · Give and take
Oct 2026 to Oct 2026 300 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Pre-examination
Lighthouse Green Fuels ProjectGenerating Stations · Land within the boroughs of Stockton-on-Tees and Redcar and Cleveland, Teesside. The proposed Sustainable Aviation Fuel (SAF) production site (the ‘Main Site’) is located on the north bank of the River Tees, south of Seal Sands Road.
application due September 2026 27.6 km away
Decided
The Net Zero Teesside ProjectGenerating Stations · Land at and in the vicinity of Teesworks, Redcar, Teesside, TS10 5QW
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.