Country England and Wales › Region North East › Council Sunderland › Neighbourhood Monkwearmouth › Postcode SR6 9QU What's changing near SR6 9QU Within 2 km, around Monkwearmouth in Sunderland. Building, planning, schools, transport, prices and crime.
109 new homes completed within 2 km, last 2 years
344 homes given permission on brownfield sites since 2021
+2.5% like-for-like prices in Monkwearmouth, 2024 → 2025 (council +3.9%)
-7% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 23 new homes completed houses · May 2025 – Feb 2026
Feb 2026 1.3 km away New homes 37 new homes completed houses · Sep 2025 – Jan 2026
Jan 2026 1.2 km away New homes 45 new homes completed 4 flats, 41 houses · Nov 2024 – Sep 2025
Sept 2025 1.4 km away Planning permission Oct 2024 1.8 km away Planning permission Apr 2024 1.8 km away Planning permission Jul 2022 1.3 km away Planning permission Mar 2022 1.9 km away Planning permission Jul 2021 1.7 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
19 homes extended 2021–2025, typically adding 29 m²
42 since energy certificates began (2008)
0 in SR6 9QU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 15 storm overflows within 2 km
797 hours of spills in 2025 between them (typical neighbourhood: about 36)
283 spill events counted
Northumbrian Water Deptford Pumping Station into River Wear (Saline Estuary) 46 spills, 200 hours in 2025
1.8 km away Northumbrian Water St Peters Pumping Station Outfall N into Wear Estuary 15 spills, 178 hours in 2025
1.4 km away Northumbrian Water Bodlewell Lane Cso into Wear Estuary 24 spills, 108 hours in 2025
1.6 km away Northumbrian Water Queen Alexandra Bridge Ps into River Wear (Tidal) 32 spills, 79 hours in 2025
2.0 km away Northumbrian Water Low Southwick Sps into River Wear 41 spills, 77 hours in 2025
1.8 km away Northumbrian Water Gill Cemetery Cso (Su061) into Wear (Saline Estuary) 28 spills, 57 hours in 2025
1.6 km away Northumbrian Water Pallion Cso 4 into River Wear 38 spills, 48 hours in 2025
1.4 km away Northumbrian Water Hay Street Cso Su056 into Wear (Saline Estuary) 10 spills, 17 hours in 2025
1.5 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 41 planned, approved or being built and 9 running (70 MW between them). Those within 5 km are on the map above.
Rooftop solar University Of Sunderland Reg Vardy Centre, Liberty Way - Solar Pv System Approved, not yet built · 710 kW
Jun 2024 1.2 km away Rooftop solar University Of Sunderland, Saint Peters Gate - Solar Panels Approved, not yet built · 230 kW
Apr 2026 1.2 km away Rooftop solar Saint Marys Car Park, Saint Marys Boulevard - Solar Panels Approved, not yet built · 210 kW
Feb 2023 1.7 km away Battery storage Saint Marys Car Park, Saint Marys Boulevard - Battery Storage Approved, not yet built
Feb 2023 1.7 km away Rooftop solar University of Sunderland - Solar PV Panels Approved, not yet built · 210 kW
Jun 2022 2.2 km away Solar farm E/o the Academy Of Light, Sunderland Road - Solar Farm Planning application in · 40 MW
Jul 2024 2.3 km away Rooftop solar Buzz Bingo, Pallion New Road - Solar PV Panels Planning application in
May 2026 2.3 km away Rooftop solar Clearly Drinks, Riverside Road - Solar Panels Approved, not yet built · 250 kW
Mar 2025 2.5 km away Rooftop solar Sunderland City Council Independent Living Centre - Solar Panels Planning application in · 220 kW
Sept 2024 4.8 km away Rooftop solar Venerable Bede Church Of England Academy - Solar Panels Approved, not yet built · 320 kW
Road and street works within 1 km 16 permitted works running now or planned, 4 of them major.
Major Bede Street South Back, Sunderland Optional permit (no fee) e.g. for traffic management etc · NORTHUMBRIAN WATER · Road closure
Oct 2026 to Oct 2026 700 m away Major Roker Terrace West Back, Sunderland Utility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · Road closure
Sept 2026 to Oct 2026 850 m away Major, planned Roker Terrace, Sunderland Utility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · No carriageway incursion
Sept 2026 to Oct 2026 900 m away Major, planned Roker Terrace, Sunderland Utility asset works · NORTHERN POWERGRID (NORTHEAST) PLC · No carriageway incursion
Sept 2026 to Oct 2026 950 m away Standard Stansfield Street East Back, Sunderland Utility repair and maintenance works · NORTHUMBRIAN WATER · Temp obstruction 15 minute delay
Oct 2026 to Oct 2026 650 m away Standard Harelaw Drive, Sunderland Utility repair and maintenance works · NORTHERN GAS NETWORKS · Give and take
Oct 2026 to Oct 2026 900 m away Minor Fulwell Road, Sunderland Section 50 · SUNDERLAND CITY COUNCIL · Give and take
Oct 2026 to Oct 2026 200 m away Minor Hampden Road, Sunderland Optional permit (no fee) e.g. for traffic management etc · NORTHUMBRIAN WATER · Multi-way signals
Oct 2026 to Oct 2026 250 m away Minor Grantham Road, Sunderland Optional permit (no fee) e.g. for traffic management etc · NORTHUMBRIAN WATER · Two-way signals
Major infrastructure projects within 30 km Decided decided Jul 2020 5.5 km away Decided decided Sept 2018 6.3 km away Decided decided Jan 2016 12.1 km away Decided decided Jan 2021 13.5 km away Decided decided Jul 2013 25.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Nissan Test Track (solar farm, 5.6 km); Nissan Wind Farm (wind farm, 6.5 km); Nissan Motors Plant Extn (wind farm, 6.5 km); Unipres building (rooftop solar, 6.7 km); Port of Tyne (battery storage, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.