Country England and Wales › Region North East › Council Sunderland › Neighbourhood Millfield › Postcode SR4 6HH What's changing near SR4 6HH Within 2 km, around Millfield in Sunderland. Building, planning, schools, transport, prices and crime.
206 new homes completed within 2 km, last 2 years
276 homes given permission on brownfield sites since 2021
+3.1% like-for-like prices in Millfield, 2024 → 2025 (council +3.9%)
-35% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 25 new homes completed houses · Oct 2025 – Sep 2026
Sept 2026 1.7 km away New homes 6 new homes completed flats · Sep 2026
Sept 2026 1.4 km away New homes 5 new homes completed flats · Aug 2026
Aug 2026 2.0 km away New homes 10 new homes completed houses · Apr 2026 – Jun 2026
Jun 2026 1.9 km away New homes 8 new homes completed flats · Apr 2026
May 2026 1.9 km away New homes 29 new homes completed 4 flats, 25 houses · Nov 2025 – Apr 2026
Apr 2026 1.6 km away New homes 10 new homes completed houses · Feb 2026 – Apr 2026
Apr 2026 1.6 km away New homes 15 new homes completed flats · Jan 2026
Jan 2026 1.7 km away New homes 8 new homes completed houses · Dec 2025
Dec 2025 1.6 km away New homes 7 new homes completed houses · Nov 2025
Dec 2025 1.6 km away New homes 9 new homes completed houses · Oct 2025 – Nov 2025
Nov 2025 1.6 km away New homes 5 new homes completed houses · Oct 2025
Oct 2025 1.7 km away New homes 16 homes extended 2021–2025, typically adding 26 m²
57 since energy certificates began (2008)
1 in SR4 6HH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 12 storm overflows within 2 km
671 hours of spills in 2025 between them (typical neighbourhood: about 36)
315 spill events counted
Northumbrian Water Deptford Pumping Station into River Wear (Saline Estuary) 46 spills, 200 hours in 2025
750 m away Northumbrian Water Castletown Way Sps into River Wear 40 spills, 126 hours in 2025
1.7 km away Northumbrian Water Queen Alexandra Bridge Ps into River Wear (Tidal) 32 spills, 79 hours in 2025
800 m away Northumbrian Water Low Southwick Sps into River Wear 41 spills, 77 hours in 2025
850 m away Northumbrian Water Gill Cemetery Cso (Su061) into Wear (Saline Estuary) 28 spills, 57 hours in 2025
1.2 km away Northumbrian Water Pallion Cso 4 into River Wear 38 spills, 48 hours in 2025
1.1 km away Northumbrian Water Pallion Pumping Station into River Wear (Saline Estuary) 31 spills, 33 hours in 2025
1.0 km away Northumbrian Water Hay Street Cso Su056 into Wear (Saline Estuary) 10 spills, 17 hours in 2025
1.4 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 51 planned, approved or being built and 10 running (75 MW between them). Those within 5 km are on the map above.
Rooftop solar Buzz Bingo, Pallion New Road - Solar PV Panels Planning application in
May 2026 450 m away Rooftop solar University of Sunderland - Solar PV Panels Approved, not yet built · 210 kW
Jun 2022 1000 m away Rooftop solar Saint Marys Car Park, Saint Marys Boulevard - Solar Panels Approved, not yet built · 210 kW
Feb 2023 1.4 km away Battery storage Saint Marys Car Park, Saint Marys Boulevard - Battery Storage Approved, not yet built
Feb 2023 1.4 km away Rooftop solar Clearly Drinks, Riverside Road - Solar Panels Approved, not yet built · 250 kW
Mar 2025 1.6 km away Rooftop solar University Of Sunderland, Saint Peters Gate - Solar Panels Approved, not yet built · 230 kW
Apr 2026 1.9 km away Rooftop solar University Of Sunderland Reg Vardy Centre, Liberty Way - Solar Pv System Approved, not yet built · 710 kW
Jun 2024 2.2 km away Rooftop solar Calsonic Kansei - Solar Array Approved, not yet built · 2 MW
Jun 2024 3.5 km away Battery storage Hastings Hill Farm, Foxcover Road - Battery Energy Storage Approved, not yet built · 38 MW
Jul 2025 3.7 km away Rooftop solar Sunderland City Council Independent Living Centre - Solar Panels Planning application in · 220 kW
Sept 2024 3.7 km away Road and street works within 1 km 2 permitted works running now or planned, 1 of them major.
Major Crown Road, Sunderland Utility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Sept 2026 to Oct 2026 950 m away Standard Farringdon Row, Sunderland Utility asset works · LAST MILE ELECTRICITY LIMITED (Formerly GLOBAL UTILITY CONNECTIONS) · Two-way signals
Oct 2026 to Oct 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jul 2020 4.8 km away Decided decided Sept 2018 5.8 km away Decided decided Jan 2021 11.8 km away Decided decided Jan 2016 12.8 km away Decided decided Jul 2013 26.6 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Nissan Test Track (solar farm, 4.2 km); Nissan Wind Farm (wind farm, 4.8 km); Nissan Motors Plant Extn (wind farm, 4.8 km); Unipres building (rooftop solar, 5.2 km); South Sharpley Wind Farm (Revised) (wind farm, 7.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.