What's changing near SR4 0DE
Within 2 km, around Pallion North in Sunderland. Building, planning, schools, transport, prices and crime.
20new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+4.6%like-for-like prices in Pallion North, 2024 → 2025 (council +3.9%)
-9%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 3 postcodes nearby had new homes completed in the last two years.
1homes extended 2021–2025, typically adding 18 m²
11since energy certificates began (2008)
0in SR4 0DE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
541hours of spills in 2025 between them (typical neighbourhood: about 36)
129spill events counted
- Northumbrian Water
Ferryboat Lane Pumping Stationinto River Wear (Saline Estuary)12 spills, 142 hours in 2025
1.4 km away - Northumbrian Water
Castletown Way Spsinto River Wear40 spills, 126 hours in 2025
1.5 km away - Northumbrian Water
North Hylton Spsinto River Wear16 spills, 109 hours in 2025
1.4 km away - Northumbrian Water
Golden Lion Spsinto River Wear20 spills, 88 hours in 2025
1.6 km away - Northumbrian Water
Pottery Lane Psinto River Wear9 spills, 43 hours in 2025
1.3 km away - Northumbrian Water
Pallion Pumping Stationinto River Wear (Saline Estuary)31 spills, 33 hours in 2025
1.7 km away - Northumbrian Water
St Lukes Road Csointo River Wear1 spills, 0 hours in 2025
1.3 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
54 planned, approved or being built and 11 running (76 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Buzz Bingo, Pallion New Road - Solar PV PanelsPlanning application in
May 2026
1.7 km away - Rooftop solar
Calsonic Kansei - Solar ArrayApproved, not yet built · 2 MW
Jun 2024
2.0 km away - Rooftop solar
Clearly Drinks, Riverside Road - Solar PanelsApproved, not yet built · 250 kW
Mar 2025
2.0 km away - Battery storage
Hastings Hill Farm, Foxcover Road - Battery Energy StorageApproved, not yet built · 38 MW
Jul 2025
2.4 km away - Rooftop solar
University of Sunderland - Solar PV PanelsApproved, not yet built · 210 kW
Jun 2022
2.6 km away - Battery storage
Fox Cover Road - Battery Energy StorageApproved, not yet built · 30 MW
Sept 2024
2.6 km away - Solar farm
Washington Road - Solar FarmApproved, not yet built · 20 MW
Dec 2021
2.9 km away - Rooftop solar
Saint Marys Car Park, Saint Marys Boulevard - Solar PanelsApproved, not yet built · 210 kW
Feb 2023
3.1 km away - Battery storage
Saint Marys Car Park, Saint Marys Boulevard - Battery StorageApproved, not yet built
Feb 2023
3.1 km away - Rooftop solar
University Of Sunderland, Saint Peters Gate - Solar PanelsApproved, not yet built · 230 kW
Apr 2026
3.6 km away
Road and street works within 1 km
2 permitted works running now or planned.
- Standard
Broadmayne Avenue, SunderlandRemedial works · BT · Give and take
Oct 2026 to Oct 2026
800 m away - Standard
Broadmayne Gardens, SunderlandRemedial works · BT · Give and take
Oct 2026 to Oct 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jul 2020
4.0 km away - Decideddecided Sept 2018
5.0 km away - Decideddecided Jan 2021
10.3 km away - Decideddecided Jan 2016
12.5 km away - Decideddecided Jul 2013
26.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Nissan Test Track (solar farm, 2.9 km); Nissan Wind Farm (wind farm, 3.3 km); Nissan Motors Plant Extn (wind farm, 3.3 km); Unipres building (rooftop solar, 3.8 km); Houghton-le-Spring Landfill Site (landfill gas, 6.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.