Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
26hours of spills in 2025 between them (typical neighbourhood: about 36)
31spill events counted
Wessex Water
Fordingbridge Csointo River Avon(S) · near bathing water: River Avon at Fordingbridge31 spills, 26 hours in 2025
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
20 permitted works running now or planned, 2 of them major.
Major
Whitsbury Road, FordingbridgeHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Two-way signals
Sept 2026 to Nov 2026 400 m away
Major
Albion Road, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Road closure
Dec 2026 to Dec 2026 550 m away
Standard
Waverley Road, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Give and take
Dec 2026 to Dec 2026 200 m away
Standard
Waverley Close, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Give and take
Dec 2026 to Dec 2026 250 m away
Standard
Willow Avenue, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Give and take
Dec 2026 to Dec 2026 450 m away
Standard
Willow Avenue, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Give and take
Dec 2026 to Dec 2026 450 m away
Standard
Alexandra Road, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Multi-way signals
Dec 2026 to Dec 2026 600 m away
Standard
Allenwater Drive, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Give and take
Dec 2026 to Dec 2026 700 m away
Standard
Stephen Martin Gardens, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Give and take
Dec 2026 to Dec 2026 750 m away
Major infrastructure projects within 30 km
Decided
A303 StonehengeHighways · Linear route between Amesbury and Berwick Down, Wiltshire
decided Jul 2023 26.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Fordingbridge, Rockbourne & Woodgreen: +16% over five years (2020 → 2025).
Council tax list: 120 homes added in the neighbourhood since April 2024.
Population (GP registrations): +1.3% in two years.