What's changing near SP6 1FP
Within 2 km, around Fordingbridge, Rockbourne & Woodgreen in New Forest. Building, planning, schools, transport, prices and crime.
134new homes completed within 2 km, last 2 years
4homes given permission on brownfield sites since 2021
+0.2%like-for-like prices in Fordingbridge, Rockbourne & Woodgreen, 2024 → 2025 (council +1.1%)
-1%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
31 new homes completedhouses · May 2025 – Oct 2026
Oct 2026
1.3 km away - New homes
51 new homes completed7 flats, 44 houses · Dec 2025 – Oct 2026
Oct 2026
250 m away - New homes
6 new homes completedhouses · Nov 2025 – Jul 2026
Jul 2026
1.2 km away - New homes
13 new homes completedhouses · Dec 2024 – Jul 2025
Jul 2025
400 m away - New homes
12 new homes completed7 flats, 5 houses · Oct 2024 – Apr 2025
Apr 2025
400 m away - Planning permissionSept 2022
1.4 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
4homes extended 2021–2025, typically adding 25 m²
9since energy certificates began (2008)
0in SP6 1FP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
26hours of spills in 2025 between them (typical neighbourhood: about 36)
31spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
4 planned, approved or being built and 1 running (5 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Station Mill, Ashford Road - Solar PanelsApproved, not yet built · 220 kW
Mar 2023
1.5 km away - Solar farm
Hamer Warren Solar FarmBeing built · 23 MW
Jan 2023
5.5 km away - Battery storage
Land Adj Harmer Warren QuarryBeing built · 10 MW
Nov 2022
5.9 km away - Rooftop solar
Batten Road, Downton - Solar Photovoltaic PanelsApproved, not yet built · 510 kW
Aug 2022
6.8 km away
Running nearest: Cross Roads Plantation (solar farm, 4.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
19 permitted works running now or planned, 2 of them major.
- Major
Whitsbury Road, FordingbridgeHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Two-way signals
Sept 2026 to Nov 2026
200 m away - Major
Albion Road, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Road closure
Dec 2026 to Dec 2026
750 m away - Standard
Waverley Close, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Give and take
Dec 2026 to Dec 2026
450 m away - Standard
Waverley Road, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Give and take
Dec 2026 to Dec 2026
450 m away - Standard
Willow Avenue, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Give and take
Dec 2026 to Dec 2026
550 m away - Standard
Willow Avenue, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Give and take
Dec 2026 to Dec 2026
550 m away - Standard
Allenwater Drive, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Give and take
Dec 2026 to Dec 2026
750 m away - Standard
Stephen Martin Gardens, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Give and take
Dec 2026 to Dec 2026
800 m away - Standard
Alexandra Road, FordingbridgeUtility repair and maintenance works · WESSEX WATER · Multi-way signals
Dec 2026 to Dec 2026
800 m away
Major infrastructure projects within 30 km
- Decided
A303 StonehengeHighways · Linear route between Amesbury and Berwick Down, Wiltshire decided Jul 2023
26.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.