Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
11 planned, approved or being built and 2 running (55 MW between them). Those within 5 km are on the map above.
Rooftop solar
Hulse Road - Solar PanelsApproved, not yet built · 160 kW
May 2022 4.1 km away
Rooftop solar
Hulse Road - Solar PanelsApproved, not yet built · 410 kW
Mar 2022 4.1 km away
Rooftop solar
Salisbury City Hall - Solar PV PanelsApproved, not yet built · 180 kW
Feb 2022 4.5 km away
Solar farm
Beech Tree Solar FarmApproved, not yet built · 30 MW
Jul 2025 4.6 km away
Rooftop solar
Bourne Hill Council OfficeApproved, not yet built
Feb 2021 5.0 km away
Rooftop solar
Salisbury District Hospital, Odstock Road - Solar PanelsApproved, not yet built · 760 kW
Mar 2024 6.6 km away
Rooftop solar
Salisbury District Hospital, Odstock Road - Solar PanelsApproved, not yet built · 190 kW
May 2025 6.6 km away
Rooftop solar
Salisbury District Hospital, Odstock Road - Solar PVApproved, not yet built · 260 kW
Dec 2025 6.6 km away
Rooftop solar
The Salisbury Hospice, Salisbury District Hospital - Solar PV PanelsApproved, not yet built · 210 kW
Apr 2026 6.6 km away
Rooftop solar
Chemring Countermeasures Limited, High Post Road- Solar ArrayApproved, not yet built
Jun 2024 7.0 km away
Battery storage
Road and street works within 1 km
4 permitted works running now or planned.
Standard
West Street, WiltonCore Sampling · WILTSHIRE COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 300 m away
Standard
Silver Street, WiltonCore Sampling · WILTSHIRE COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 300 m away
Standard
South Street, WiltonCore Sampling · WILTSHIRE COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 300 m away
Minor
South Street, WiltonUtility repair and maintenance works · WESSEX WATER · Two-way signals
Oct 2026 to Oct 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
A303 StonehengeHighways · Linear route between Amesbury and Berwick Down, Wiltshire
decided Jul 2023 10.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Wilton, Nadder & Ebble: +19% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.2% in two years.