Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
58hours of spills in 2025 between them (typical neighbourhood: about 36)
9spill events counted
Southern Water
Ringwood Drive North Baddesley Ceointo Unnamed Trib. Of River Test9 spills, 58 hours in 2025
1.0 km away
Southern Water
Botley Road Wps (North Baddesley)into Tributary Of The Tadburn Lake0 spills, 0 hours in 2025
39 planned, approved or being built and 10 running (77 MW between them). Those within 5 km are on the map above.
Battery storage
Misslebrook Farm, Botley Road - Battery StorageApproved, not yet built · 60 MW
Apr 2024 450 m away
Rooftop solar
Cooper Vision, Speedwell Close - Solar PanelsApproved, not yet built · 640 kW
Oct 2024 3.5 km away
Rooftop solar
Unit 2b, School Lane - Solar PanelsApproved, not yet built · 320 kW
Jun 2023 3.6 km away
Battery storage
Upton Lane, Nursling - Battery Storage FacilityApproved, not yet built · 50 MW
Jan 2022 3.9 km away
Battery storage
Upton Lane, Nursling - Battery Energy StorageApproved, not yet built · 100 MW
May 2025 3.9 km away
Rooftop solar
Chandlers Ford - Solar panelsApproved, not yet built · 200 kW
Jun 2022 4.0 km away
Battery storage
Station Road, Crescent Industrial Estate - Battery Storage FacilityApproved, not yet built · 62 MW
Jan 2026 4.9 km away
Rooftop solar
Asquith Nursery, David Lloyd Leisure - Solar PanelsApproved, not yet built · 300 kW
Jan 2024 5.0 km away
Rooftop solar
Southampton General Hospital, Tremona Road - Solar PanelsApproved, not yet built · 250 kW
Feb 2024 5.0 km away
Rooftop solar
Mauretania Road, Nursling - Solar PanelsPlanning application in · 190 kW
Jul 2023 5.0 km away
Road and street works within 1 km
3 permitted works running now or planned.
Standard
Botley Road, North BaddesleyUtility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Multi-way signals
Nov 2026 to Nov 2026 300 m away
Standard
Rosslyn Close, North BaddesleyUtility asset works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Give and take
Oct 2026 to Oct 2026 350 m away
Minor
Botley Road, North BaddesleyOptional permit (no fee) e.g. for traffic management etc · EE Ltd · No carriageway incursion
Oct 2026 to Oct 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
M3 Junction 9 ImprovementHighways · Adjacent to Winnal industrial estate, Winchester, north of Alresford Road B3404
decided May 2024 14.7 km away
Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant.
application due in May 2026 23.6 km away
Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation.
application due Q4 2019 28.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in North Baddesley & Braishfield: +17% over five years (2020 → 2025).
Council tax list: 180 homes added in the neighbourhood since April 2024.
Population (GP registrations): +1.6% in two years.
Running nearest: Grove Solar Park (Phase 1) (solar farm, 3.2 km); Grove Solar Park (Phase 2) (solar farm, 3.2 km); Highwood Lane (solar farm, 4.8 km); Field House Solar / Hursley Road (solar farm, 4.8 km); Squabb Wood (landfill gas, 6.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.