Within 2 km, around Langdown & Dibden Purlieu in New Forest. Building, planning, schools, transport, prices and crime.
58new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.3%like-for-like prices in Langdown & Dibden Purlieu, 2024 → 2025 (council +1.1%)
+22%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedhouses · Jul 2026
Jul 2026
1.4 km away - New homes
25 new homes completedhouses · Dec 2025 – Feb 2026
Feb 2026
400 m away - New homes
21 new homes completed14 flats, 7 houses · Oct 2025
Nov 2025
1.2 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 7 postcodes nearby had new homes completed in the last two years.
6homes extended 2021–2025, typically adding 55 m²
14since energy certificates began (2008)
3in SO45 4RJ itself
- Extendedcertificate 2024
- Extendedcertificate 2014
- Extendedcertificate 2014
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
23 planned, approved or being built and 7 running (51 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Staplewood Campus, Marchwood - Solar PanelsApproved, not yet built · 200 kW
Aug 2025
4.7 km away - Battery storage
East Road, Marchwood - Battery Energy StorageApproved, not yet built · 200 MW
Nov 2025
4.9 km away - Rooftop solar
Lucia Foster Welch Student Hall Of Residence - Solar PanelsApproved, not yet built
Sept 2022
5.1 km away - Rooftop solar
Buildings J K And Z Tesla Centre, Herbert Walker Avenue - Solar PanelsApproved, not yet built · 840 kW
Jan 2023
5.3 km away - Rooftop solar
Harbour Parade - Solar PhotovoltaicsApproved, not yet built
Jul 2025
5.5 km away - Rooftop solar
West Quay Retail Park, Harbour Parade - Solar PanelsApproved, not yet built
Dec 2025
5.5 km away - Battery storage
Slowhill Copse, Bury Road - Battery Storage FacilityApproved, not yet built
Apr 2025
6.0 km away - Battery storage
Bulls Copse Road, Marchwood Bypass - Battery Energy Storage SystemApproved, not yet built · 50 MW
Feb 2026
6.3 km away - Rooftop solar
CooperVision, Ensign Way - Solar PanelsApproved, not yet built · 1 MW
Sept 2024
6.5 km away - Rooftop solar
South Point, Hamble-Le-Rice - Solar PanelsApproved, not yet built · 500 kW
Sept 2024
6.5 km away
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
- Major
Oaklands Way-Cleveland Drive Footpath, Dibden PurlieuNew service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · No carriageway incursion
Jan 2027 to Jan 2027
500 m away - Major
Kensington Fields, Dibden PurlieuNew service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Some carriageway incursion
Sept 2026 to Oct 2026
600 m away - Standard
North Road, Dibden PurlieuUtility repair and maintenance works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Multi-way signals
Oct 2026 to Nov 2026
350 m away - Standard
Water Lane, Dibden PurlieuUtility repair and maintenance works · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Multi-way signals
Dec 2026 to Jan 2027
450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant. application due in May 2026
18.8 km away - Decideddecided May 2024
25.7 km away - Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation. application due Q4 2019
27.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Fawley Waste to Energy Plant (energy from waste, 2.9 km); Tavells Lane Solar Farm (solar farm, 5.1 km); Marchwood ERF (energy from waste, 5.4 km); The Manor of Cadland Estate - extension (solar farm, 6.6 km); Netley Landfill Site, Hampshire (Extension) (landfill gas, 6.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.