What's changing near SO45 3QE
Within 2 km, around Langdown & Dibden Purlieu in New Forest. Building, planning, schools, transport, prices and crime.
57new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.3%like-for-like prices in Langdown & Dibden Purlieu, 2024 → 2025 (council +1.1%)
+22%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedhouses · Jul 2026
Jul 2026
1.3 km away - New homes
25 new homes completedhouses · Dec 2025 – Feb 2026
Feb 2026
1.4 km away - New homes
21 new homes completed14 flats, 7 houses · Oct 2025
Nov 2025
1.1 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
4homes extended 2021–2025, typically adding 41 m²
12since energy certificates began (2008)
1in SO45 3QE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
1spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
23 planned, approved or being built and 7 running (51 MW between them). Those within 5 km are on the map above.
- Rooftop solar
CooperVision, Ensign Way - Solar PanelsApproved, not yet built · 1 MW
Sept 2024
5.2 km away - Rooftop solar
South Point, Hamble-Le-Rice - Solar PanelsApproved, not yet built · 500 kW
Sept 2024
5.2 km away - Rooftop solar
Lucia Foster Welch Student Hall Of Residence - Solar PanelsApproved, not yet built
Sept 2022
5.4 km away - Battery storage
Hound RoadPlanning application in
Sept 2020
5.7 km away - Battery storage
Hamble Lane Battery Energy StorageApproved, not yet built · 6 MW
Nov 2019
5.9 km away - Battery storage
East Road, Marchwood - Battery Energy StorageApproved, not yet built · 200 MW
Nov 2025
6.0 km away - Rooftop solar
Staplewood Campus, Marchwood - Solar PanelsApproved, not yet built · 200 kW
Aug 2025
6.1 km away - Rooftop solar
Harbour Parade - Solar PhotovoltaicsApproved, not yet built
Jul 2025
6.1 km away - Rooftop solar
West Quay Retail Park, Harbour Parade - Solar PanelsApproved, not yet built
Dec 2025
6.1 km away - Rooftop solar
Buildings J K And Z Tesla Centre, Herbert Walker Avenue - Solar PanelsApproved, not yet built · 840 kW
Jan 2023
6.2 km away - Battery storage
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant. application due in May 2026
17.5 km away - Decideddecided May 2024
25.8 km away - Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation. application due Q4 2019
26.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Fawley Waste to Energy Plant (energy from waste, 1.3 km); The Manor of Cadland Estate - extension (solar farm, 5.2 km); The Manor of Cadland Estate (solar farm, 5.6 km); Netley Landfill Site, Hampshire (Extension) (landfill gas, 6.2 km); Netley Landfill Solar (solar farm, 6.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.