Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
109hours of spills in 2025 between them (typical neighbourhood: about 36)
18spill events counted
Southern Water
Downs Park Totton Ceointo Bartley Water (Tidal)12 spills, 70 hours in 2025
350 m away
Southern Water
Ashurst Bridge Ceointo Bartley Water6 spills, 39 hours in 2025
1.1 km away
Southern Water
Brunel Road Wpsinto River Test Estuary0 spills, 0 hours in 2025
Beaumont Road, TottonUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Nov 2026 to Dec 2026 900 m away
Major
Testwood Lane, TottonUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Sept 2026 to Nov 2026 950 m away
Minor
Spicers Hill, TottonUtility asset works · BT · Lane closure
Oct 2026 to Oct 2026 250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
M3 Junction 9 ImprovementHighways · Adjacent to Winnal industrial estate, Winchester, north of Alresford Road B3404
decided May 2024 22.6 km away
Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant.
application due in May 2026 24.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Totton Rushington: +17% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.5% in two years.
New school: GLADE SchoolOther independent special school, other independent special school
Aug 2020 700 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 7 postcodes nearby had new homes completed in the last two years.
Battery storage
Upton Lane, Nursling - Battery Storage FacilityApproved, not yet built · 50 MW
Jan 2022 4.3 km away
Battery storage
Upton Lane, Nursling - Battery Energy StorageApproved, not yet built · 100 MW
May 2025 4.3 km away
Running nearest: Testwood Water Supply Works (solar farm, 2.2 km); Marchwood ERF (energy from waste, 3.2 km); Tavells Lane Solar Farm (solar farm, 3.3 km); Grove Solar Park (Phase 1) (solar farm, 5.7 km); Grove Solar Park (Phase 2) (solar farm, 5.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.