East Road, Marchwood - Battery Energy StorageApproved, not yet built · 200 MW
Nov 2025 5.7 km away
Rooftop solar
Mauretania Road, Nursling - Solar PanelsPlanning application in · 190 kW
Jul 2023 5.9 km away
Battery storage
Station Road, Crescent Industrial Estate - Battery Storage FacilityApproved, not yet built · 62 MW
Jan 2026 6.0 km away
Rooftop solar
Asquith Nursery, David Lloyd Leisure - Solar PanelsApproved, not yet built · 300 kW
Jan 20246.1 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
M3 Junction 9 ImprovementHighways · Adjacent to Winnal industrial estate, Winchester, north of Alresford Road B3404
decided May 2024 25.4 km away
Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant.
application due in May 2026 26.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Ashurst & Cadnam: +25% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.4% in two years.
Upton Lane, Nursling - Battery Storage FacilityApproved, not yet built · 50 MW
Jan 2022 7.0 km away
Battery storage
Upton Lane, Nursling - Battery Energy StorageApproved, not yet built · 100 MW
May 2025 7.0 km away
Running nearest: Tavells Lane Solar Farm (solar farm, 4.4 km); Testwood Water Supply Works (solar farm, 4.5 km); Marchwood ERF (energy from waste, 4.6 km); Grove Solar Park (Phase 1) (solar farm, 8.2 km); Grove Solar Park (Phase 2) (solar farm, 8.2 km).