48 planned, approved or being built and 8 running (50 MW between them). Those within 5 km are on the map above.
Rooftop solar
Unit 1, Strategic Park, Comines Way - Solar PanelsApproved, not yet built · 340 kW
Sept 2022 1.6 km away
Rooftop solar
Strategic Park, Comines Way - Solar Photovoltaic PanelsPlanning application in · 410 kW
Oct 2022 1.6 km away
Rooftop solar
Sainsbury Supermarket, Tollbar Way - Solar PV PanelsApproved, not yet built · 840 kW
Mar 2025 1.9 km away
Rooftop solar
Utilita Bowl, Marshall Drive - Solar PanelsApproved, not yet built · 430 kW
May 2024 2.3 km away
Rooftop solar
National Air Traffic Services, Sopwith Way - Solar PanelsApproved, not yet built · 990 kW
Aug 2023 2.6 km away
Rooftop solar
Antelope Retail Park, Bursledon Road - Solar Photovoltaic PanelsApproved, not yet built · 670 kW
Apr 2026 2.6 km away
Rooftop solar
Holiday Inn Express, Botley Road - Solar PanelsApproved, not yet built · 240 kW
May 2025 2.7 km away
Solar farm
ATS, Sopwith Way - Ground Mounted Solar Photovoltaic ArraysApproved, not yet built · 3 MW
Jun 2024 2.9 km away
Battery storage
Butts Field, Mill Lane - Battery StorageApproved, not yet built · 99 MW
Oct 2024 3.0 km away
Battery storage
Hamble Lane Battery Energy StorageApproved, not yet built · 6 MW
Nov 20193.6 km away
Road and street works within 1 km
10 permitted works running now or planned, 7 of them major.
Major
Upper Yardley Road, Hedge EndUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Nov 2026 to Dec 2026 150 m away
Major
Bursledon Road, Hedge EndUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Two-way signals
Nov 2026 to Dec 2026 200 m away
Major
Pretoria Road, Hedge EndUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Nov 2026 to Dec 2026 200 m away
Major, planned
Bursledon Road, Hedge EndUtility asset works · CITYFIBRE METRO NETWORKS LTD · Multi-way signals
Jan 2027 to Feb 2027 250 m away
Major
Bursledon Road, Hedge EndUtility asset works · CITYFIBRE METRO NETWORKS LTD · Multi-way signals
Jan 2027 to Feb 2027 250 m away
Major, planned
Heath House Lane, Hedge EndHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 700 m away
Major
Heath House Lane, Hedge EndHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 700 m away
Standard
St Johns Road, Hedge EndNew service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Some carriageway incursion
Oct 2026 to Oct 2026 700 m away
Standard
Footpaths At St Johns Road Gardens, Hedge EndNew service connection · SCOTTISH AND SOUTHERN POWER DISTRIBUTION (SSEPD) · Some carriageway incursion
Major infrastructure projects within 30 km
Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant.
application due in May 2026 11.5 km away
Decided
M3 Junction 9 ImprovementHighways · Adjacent to Winnal industrial estate, Winchester, north of Alresford Road B3404
decided May 2024 18.4 km away
Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation.
application due Q4 2019 18.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Hedge End South: +18% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.2% in two years.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Battery storage
Hound RoadPlanning application in
Sept 2020 3.8 km away
Rooftop solar
Allington Lane, West End - Solar panelsApproved, not yet built · 500 kW