What's changing near SO22 6NX
Within 2 km, around Winchester North & Sparsholt in Winchester. Building, planning, schools, transport, prices and crime.
204new homes completed within 2 km, last 2 years
21homes given permission on brownfield sites since 2021
+0.1%like-for-like prices in Winchester North & Sparsholt, 2024 → 2025 (council -0.2%)
+5%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
23 new homes completedhouses · Oct 2025 – Oct 2026
Oct 2026
1.0 km away - New homes
13 new homes completedhouses · Feb 2026 – Oct 2026
Oct 2026
1.1 km away - New homes
7 new homes completedhouses · Apr 2026 – Oct 2026
Oct 2026
1.4 km away - New homes
18 new homes completedhouses · Dec 2025 – Sep 2026
Sept 2026
1.4 km away - New homes
11 new homes completedhouses · Jan 2026 – Jul 2026
Jul 2026
1.5 km away - New homes
7 new homes completedhouses · Feb 2026 – May 2026
May 2026
1.1 km away - New homes
12 new homes completedhouses · Sep 2025 – Mar 2026
Mar 2026
1.5 km away - New homes
9 new homes completedhouses · Aug 2025 – Feb 2026
Feb 2026
1.7 km away - New homes
5 new homes completedhouses · Feb 2026
Feb 2026
1.1 km away - New homes
9 new homes completedhouses · Sep 2025 – Jan 2026
Jan 2026
1.5 km away - New homes
27 new homes completedhouses · Jun 2025 – Dec 2025
Dec 2025
1.3 km away - New homes
16 new homes completed14 flats, 2 houses · Jul 2025 – Dec 2025
Dec 20251.3 km away
18homes extended 2021–2025, typically adding 48 m²
23since energy certificates began (2008)
3in SO22 6NX itself
- Extendedcertificate 2026
- Extendedcertificate 2022
- Extendedcertificate 2015
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
10 planned, approved or being built and 3 running (50 MW between them). Those within 5 km are on the map above.
- Battery storage
Stockbridge RoadApproved, not yet built · 10 MW
Dec 2017
450 m away - Rooftop solar
Micheldever Tyres Winchester, Winnall Warehouse - Solar PV PanelsApproved, not yet built
Jan 2026
3.2 km away - Rooftop solar
Sainsburys Supermarkets, Badger Farm Road - Solar PanelsApproved, not yet built · 600 kW
Jun 2024
3.9 km away - Rooftop solar
Winchester Sport And Leisure Park, Bar End Road - Solar PanelsPlanning application in · 190 kW
Apr 2026
4.0 km away - Solar farm
South Lynch Farm - Solar FarmApproved, not yet built · 20 MW
Oct 2024
4.4 km away - Battery storage
Silkstead Farm, Poles Lane - Battery Energy Storage SystemApproved, not yet built · 50 MW
Mar 2025
7.2 km away - Rooftop solar
Unit 2 To 5, Hazeley Enterprise Park - PV panelsApproved, not yet built · 190 kW
Jul 2022
7.2 km away - Solar farm
IBM Hursley - Solar PanelsApproved, not yet built
Jun 2024
7.4 km away - Battery storage
IBM Hursley - Battery StorageApproved, not yet built · 2 MW
Jun 2024
7.4 km away - Solar farm
Home Farm, Hursley Park Road - Solar PanelsApproved, not yet built · 5 MW
Jun 2025
7.9 km away
Running nearest: Three Maids Hill Solar Farm (solar farm, 3.6 km); Winchester Battery Storage (battery storage, 5.3 km); Field House Solar / Hursley Road (solar farm, 8.9 km).
Road and street works within 1 km
7 permitted works running now or planned, 6 of them major.
- Major
Rewlands Drive, HarestockHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
50 m away - Major
Amport Close, HarestockHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
150 m away - Major
Winslade Road, HarestockHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
150 m away - Major
Ashley Close, HarestockHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
200 m away - Major
Bradley Road, HarestockHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
250 m away - Major, planned
Bercote Close, LittletonHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026
750 m away - Standard
Taplings Road, WinchesterHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2024
3.5 km away - Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant. application due in May 2026
27.1 km away - Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation. application due Q4 2019
27.8 km away - Decideddecided Oct 2020
30.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.