Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
23 planned, approved or being built and 7 running (54 MW between them). Those within 5 km are on the map above.
Solar farm
IBM Hursley - Solar PanelsApproved, not yet built
Jun 2024 400 m away
Battery storage
IBM Hursley - Battery StorageApproved, not yet built · 2 MW
Jun 2024 400 m away
Solar farm
Home Farm, Hursley Park Road - Solar PanelsApproved, not yet built · 5 MW
Jun 2025 1.5 km away
Battery storage
Silkstead Farm, Poles Lane - Battery Energy Storage SystemApproved, not yet built · 50 MW
Mar 2025 1.9 km away
Solar farm
South Lynch Farm - Solar FarmApproved, not yet built · 20 MW
Oct 2024 4.3 km away
Rooftop solar
Unit 2b, School Lane - Solar PanelsApproved, not yet built · 320 kW
Jun 2023 4.5 km away
Rooftop solar
Sainsburys Supermarkets, Badger Farm Road - Solar PanelsApproved, not yet built · 600 kW
Jun 2024 4.6 km away
Rooftop solar
Cooper Vision, Speedwell Close - Solar PanelsApproved, not yet built · 640 kW
Oct 2024 5.0 km away
Battery storage
Misslebrook Farm, Botley Road - Battery StorageApproved, not yet built · 60 MW
Apr 2024 5.8 km away
Rooftop solar
Chandlers Ford - Solar panelsApproved, not yet built · 200 kW
Jun 2022 6.3 km away
Rooftop solar
Road and street works within 1 km
4 permitted works running now or planned, 4 of them major.
Major, planned
Poles Lane, HursleyHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026 100 m away
Major
Poles Lane, HursleyHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026 100 m away
Major, planned
Main Road, HursleyHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 400 m away
Major
Main Road, HursleyHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 400 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
M3 Junction 9 ImprovementHighways · Adjacent to Winnal industrial estate, Winchester, north of Alresford Road B3404
decided May 2024 9.0 km away
Pre-examination
Hampshire Water Transfer and Water Recycling ProjectDams and Reservoirs · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant.
application due in May 2026 23.9 km away
Decision
AQUIND InterconnectorElectric Lines · From the UK seaward limit in the English Channel to Lovedean Substation.
application due Q4 2019 27.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Oliver's Battery and Hursley: +18% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.9% in two years.
Unit 2 To 5, Hazeley Enterprise Park - PV panelsApproved, not yet built · 190 kW
Jul 2022 6.5 km away
Rooftop solar
Winchester Sport And Leisure Park, Bar End Road - Solar PanelsPlanning application in · 190 kW
Apr 2026 7.2 km away
Running nearest: Field House Solar / Hursley Road (solar farm, 1.4 km); Winchester Battery Storage (battery storage, 2.5 km); Highwood Lane (solar farm, 8.7 km); Grove Solar Park (Phase 1) (solar farm, 8.8 km); Grove Solar Park (Phase 2) (solar farm, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.